Unknown's avatar

About NL4WorldBank

The World Bank Team at the Royal Netherlands Embassy tweets about news related to Dutch organizations interested in working with the #WorldBank. #NL4WorldBank

eC2: Development of national methodologies for assessment of the hydromorphological status of surface water bodies of category rivers, lakes and transitional waters

Deadline: 08-May-2019 at 11:59:59 PM (Eastern Time – Washingtonwater D.C.)

Assignment Title: 1262415 – Development of national methodologies for assessment of the hydromorphological status of surface water bodies (SWB) of category rivers, lakes and transitional waters, surveying of hydro-morphological quality elements, testing and validation of methodologies and assessment of the hydromorphological status of SWBs.

Continue reading

eC2: Development of national methodology for identification and designation of Heavily Modified Water Bodies (HMWBs)by further development of the national approach

Deadline: 07-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) water

This assignment aims at the development of a national methodology for identification and designation of HMWBs by further development of the existing national approach and adaptation of most recent international best practices. The methodology should comply with the Water Framework Directive and the relevant Common Implementation Strategy Guidance documents and should simultaneously consider the local specifics and the identified deficiencies during the previous cycles of River Basin Management Plans (RBMPs). It should largely (at this stage for 3rd RBMP) be based on available data regarding the various modifications and any appraisal guidance for them and any findings of such appraisals. A testing of the methodology with application of the “mitigation measures” methods for all types of physical modifications and uses of the surface water bodies is planned within the frame of the assignment by the use of readily available data.

Continue reading

Rebuilding communities after disasters – four and a half lessons learned

The death toll from Cyclone Idai that ripped into Mozambique, Zimbabwe, and Malawi in IDAI Aftermath - A man fixes the roof of his house in Praia NovaMarch 2019 is now above 1,000, with damages estimated at $2 billion. In 2018, more than 10,000 people lost their lives in disasters (with $225 billion of economic losses). Approximately 79 percent of fatalities occurred in the Asia Pacific region, including the catastrophic earthquake and tsunami in Indonesia’s Sulawesi Island. In fact, 2017 and 2018 have been estimated as the most expensive back-to-back years for weather disasters, totaling $653 billion of losses.

Continue reading

5 facts about jobs and economic transformation in IDA countries

What are the pathways people follow to better jobs? Economies grow when more people pathwaystobetterjobs-72ppi-pngfind work, when they get better at what they do, and when they move from low-productivity work to better, higher-productivity jobs. Our newest report `Pathways to better jobs in IDA countries’ takes a closer look at how people benefit through jobs in the process of development. It identifies how the available jobs change with economic transformation and shows how the structure of labor markets differs between low, lower-middle, and middle-income countries. It points to key challenges in ensuring that workers can transition between sectors, between locations, and between self- and waged employment.

Continue reading

eC2: Vietnam Climate Smart Urbanization

Deadline: 05-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)climate

Vietnam is urbanizing at a rapid pace. Cities, particularly those in low-lying delta areas are especially vulnerable to extreme weather events and impact of climate change. The rapid pace of urbanization is expected to intensify the economic costs related to extreme events. Urbanization in Vietnam has also been accompanied by rising air and water pollution, inadequate solid waste management and wastewater treatment, urban sprawl, and loss of green space threatening urban livability. Cities are also major users of energy and major contributors of GHG emissions. The proposed activity is being carried out in collaboration with the Government of Vietnam to enhance climate smart urbanization in the country.

Continue reading

Ethiopia Kicks Off Scaling Solar Round 2

Ethiopia’s Public-Private Partnerships Directorate General (PPP-DG) within the Ministry of Finance formally initiated its Scaling Solar Round 2 tender today by issuing a Request for Pre-Qualification (RFQ) for up to 500 MW of solar photovoltaic energy projects.

All interested parties are invited to:

  • Register with the Office of the PPP-DG in-person or virtually and purchase the RFQ document for a non-refundable fee of ETB 10,000 or equivalent amount of any convertible currency. Deposits should be made to the Commercial Bank of Ethiopia, Account Name: MoFEC Acc. No: 1000003784847, SWIFT Code CBETETAA. ◦For in-person registration, the bank receipt of the deposit must be submitted to the Finance and Procurement Directorate of the Ministry of Finance (MoF-Main Building, Office Number 119) to collect the RFQ document from the PPP-DG up to two weeks before the submission deadline.

Continue reading

eC2: Egypt Solar Auction, West Nile – Technical, Environmental and Social Consultant

Deadline: 04-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) solar-wind (CC0) Pixabay-Kenueone

Accordingly, IFC is looking to appoint a technical and E&S consultant to support on the 200MW first round of auction. The consultant will be required to (i) conduct technical, commercial, and environmental and social due diligence on the Project; (ii) support in auctioning or tendering the Project; and (iii) assist in the evaluation and selection of the winning bidder up until commercial close.

Continue reading

eC2:Determination of the capacity of water bodies to take nutrient pollution

Deadline: 02-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)waterkraan-nieuws-header

The assignment comprises of three main activities:
Activity 1: Identification and quantification of the factors determining the self-purification ability of different types of water bodies of categories river, lake and transitional waters
Activity 2: Identification of the impact of different concentrations of nutrients (nitrogen and phosphorus forms) on the ecological status of the different types of water bodies of categories river, lake and transitional waters
Activity 3: Development, testing and validation of methodology/mathematical models for determining the capacity of different types of water bodies of categories river, lake and transitional waters

Continue reading

eC2: Follow-Up Survey for the Impact Evaluation of DRC Performance-Based Financing Project

Deadline: 02-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)medical-appointment-doctor-healthcare-clinic-health-hospital-medicine[7]

The assignment will be for the implementation of a follow-up study that includes household and health facility-based surveys. The large-scale surveys will be fielded in the first quarter of 2020 in the provinces of Kwango, Kwilu, Mai-Ndombe, Haut-Katanga, Haut-Lomami, Lualaba and Tanganyika. Preparatory work will start in the third quarter of 2019. The firm will work under the direct supervision of the Principal Investigators on all aspects related the implementation of the survey. The health facility survey will be conducted in health centers and general referral hospitals. It will include facility level assessment, health worker interviews, observations of patient-provider interactions and patient exit interviews. Household surveys will be conducted in the catchment areas of each of the surveyed facilities. They will cover demographic and socio-economic characteristics of the households and behaviors related to reproductive, maternal and child health. During the household visits, the survey teams will also collect anthropometric data on women and children.

Continue reading