eC2: Integrated Transport System at the Foz do Rio Itajai region: Pre-Feasibility Engineering Study

Deadline: 16-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

The objective of this study is to carry out an engineering pre-feasibility analysis of a Buspe-bus-to-barranco-geraint-rowland-flickr Rapid Transit (BRT) project in the “Foz do Rio Itajai” metropolitan area in the State of Santa Catarina, Brazil. The project consists in the implementation of a greenfield BRT system with a network of five BRT corridors and six priority bus lanes, which is expected to support a ridership of 525,000 passenger trips per day by 2030. The objective of this study is to: (i) review and validate existing pre-feasibility engineering studies, (ii) further develop the preliminary project design, (iii) estimate capital and operational costs; and (iv) provide technical recommendations for the subsequent phase.

See full tender here: INTEGRATED TRANSPORT SYSTEM AT THE FOZ DO RIO ITAJAI REGION (PRE-FEASIBILITY ENGEENERING STUDY)

eConsultant2 website: https://wbgeconsult2.worldbank.org/wbgec/index.html

Tender notification: # 1262572

Assignment Countries:

  • BR – Brazil