eC2: Improving Private Sector Participation in Dhaka Public Transport

Deadline: 24-Jun-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

The objective of the consultancy is to support the preparation of Dhaka Public Transport BRTC_double_decker_bus_03652Improvement Project (DPTIP) by i) assessing and improving institutional regulatory framework and client capacity to increase private sector participation in the public transportation sector in Dhaka; and ii) assessing and recommending specific PPP options and business-financial models for the operation of the feeders associated with the BRT line from Gazipur to Mohakhali, for the associated BRT infrastructure and for the operations of the city-wide bus service. The extent of PPP potential must be well assessed and structured based on client capacity, similar experiences in Bangladesh, the relative appetite of banks and investors in Bangladesh to invest in the transport sector (including through the exploration of financing options such as leasing), and the cost/access to finance for private operators and investors.

Continue reading

eC2: Integrated Transport System at the Foz do Rio Itajai region: Pre-Feasibility Engineering Study

Deadline: 16-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

The objective of this study is to carry out an engineering pre-feasibility analysis of a Buspe-bus-to-barranco-geraint-rowland-flickr Rapid Transit (BRT) project in the “Foz do Rio Itajai” metropolitan area in the State of Santa Catarina, Brazil. The project consists in the implementation of a greenfield BRT system with a network of five BRT corridors and six priority bus lanes, which is expected to support a ridership of 525,000 passenger trips per day by 2030. The objective of this study is to: (i) review and validate existing pre-feasibility engineering studies, (ii) further develop the preliminary project design, (iii) estimate capital and operational costs; and (iv) provide technical recommendations for the subsequent phase.

Continue reading

eC2: Support to the Design of the Operations Control Center (OCC) for SPTRANS

Deadline: 04-Apr-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

The activities to be completed by the Consultant under the TORs support activity. lu-local-bus-franz_bous-flickrSpecifically, they support the development of a new management platform for bus operations by SPTrans (SP Municipal Bus Authority) in the context of a new Operations Control Center (OCC) to be implemented. Bus operation across the city of Sao Paulo is concessioned to private operators, under the supervision of SPTrans. There are opportunities for improving the monitoring of the services and management of contracts through the development of a communication platform that allows for operators and SPTrans to interchange critical information, such as fines and operational data, and allow for real-time management of operations, as well as feed on-time information to users, such as alterations in schedule/routes and service cuts. Currently, several steps on these processes occur manually, reducing reliability of information and generating unwanted costs.

Continue reading