eC2: Sanitation Situation Analysis and Option Assessment

Deadline: 26-Mar-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) waterkraan-nieuws-header

The objective of this assignment is to conduct a comprehensive sanitation situation assessment including current practice, current capacity of sanitation actors, current interventions, barriers/aspirations with regard to sanitation issues in targeted areas. Specific objectives of this assignment are to:
1- Conduct sanitation situational analysis in areas where water supply systems will be developed under WaSSIP. The situation analysis consists of detailed demographical information/data, populations, socio-economic conditions, potential development trends, and current sanitation and hygiene challenges and interventions.
2- Carry out the gap analysis and developments across the locations in order to give some indication on the priority sanitation interventions that would be needed.
3- Carry out preliminary technical and financial assessment of proposed sanitation solution options (including soft and/or hard intervention) in accordance with the findings of situational analysis.

Continue reading

eC2: Emission Reductions Program Document Assessment

Deadline: 17-Sep-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)photo-power-plant

Assignment Description: For each of the Emission Reduction Programs in the ISFL:
Ensure the information provided in the ER Program Document Review is correct and complete (ie not leaving out information that might affect the opinion of the reader)
Conduct an independent assessment of the compliance against the approved ISFL ER Program Requirements and associated guidelines. Apply expert judgement to evaluate the feasibility of program design aspects and identify areas of improvement to inform the World Banks and Contributors review of the ISFL ER Program.

Continue reading

eC2: Climate Change Risk Assessment for Mpatamanga Project in Malawi

Deadline: 03-Sep-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)

Assignment Description: The objective is to conduct a Climate Risk Assessment for theHYDRO Mpatamanga Hydropower Project in Malawi, using the BEta version of the World Bank’s Hydropower Sector Climate Resilience Guidelines.

Continue reading

eC2: National Student Assessment, Bangladesh

Deadline: 26-Feb-2017 at 11:59:59 PM (Eastern Time – Washington D.C.)

The National Student Assessment (NSA) 2011, 2013 and NSA 2015 assessed the learning for-better-early-childhood-care-and-education-in-sri-lankaachievement of the aforementioned pupils relative to the learning outcomes prescribed in the primary curriculum. Other objectives were: to investigate differences in pupil achievement by key system, school and pupil factors {e.g., division, district, school type, locality (urban v. rural), and gender}; to examine the relationships between achievement and factors such as school size, class size, pupil-teacher ratio, attendance rate, teachers’ qualifications and training, training of school managers, and frequency of inspection; and to draw implications for improvements in teaching and learning through enhanced policy actions, planning and management, and teacher education. It is expected that relevant Government of Bangladesh (GoB) line agencies will utilize the findings and recommendations in order to inform educational planning of sub-components such as teacher professional development and curriculum reform.

Continue reading

eC2: Rooftop Solar PV Market Assessment for Turkey

Deadline: 12-Dec-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

The activity will assess the viability of a large-scale solar rooftop PV program in Turkey. solar-energyThe activity would include: (i) review of existing policies and solar resources, and experience with rooftop solar PV programs globally; (ii) market assessments in the public, commercial and residential building markets; (iii) prefeasibility studies in the viable markets; and (iv) development of a roadmap, with recommendations on the policy, regulatory, institutional, programming and incentives needed to realize these markets.

Continue reading

eConsultant2: Infrastructure Risk Assessment in Turkey

Deadline: 21-Jan-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

The Consultancy will be responsible for carrying the High-level Critical Turkey InfraInfrastructure Risk Assessment (CIRA) for the Cukurova Region. In order to achieve this, the Consultancy will manage the consultation process with stakeholders; facilitate discussions, organize and moderate workshops; collect data and conduct analyses; and, prepare draft and final documents for approval.

Continue reading

eConsultant2: Strategic Basin Assessment of Brahmaputra System in Northeast India

Deadline: 31-Oct-2015 at 11:59:59 PM (Eastern Time – Washington D.C.)

A Strategic Basin Assessment (SBA) will serve to gain a better understanding of the dynamics of the Brahmaputra river India basinbasin from a system-wide perspective, by creating a knowledge base and suite of modeling tools that can be used to examine the potential development in the basin and attendant impacts of development, and support an information-based dialogue within and between riparian states.

Continue reading