Deadline: 03-Sep-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)
Assignment Description: The objective is to conduct a Climate Risk Assessment for the Mpatamanga Hydropower Project in Malawi, using the BEta version of the World Bank’s Hydropower Sector Climate Resilience Guidelines.
You must be logged in to post a comment.