eC2: Renewable Energy and Storage Development in Zanzibar

Deadline: 27-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

U.S. Electricity Output Rose 6.2% From A Year Earlier

The objective of this work is to enable the integration of variable renewable energy (VRE) and battery storage into the Zanzibar electricity grid, thereby contributing to the Revolutionary Government of Zanzibars (RGOZ) efforts in energy security, diversification of supply options and financial and operational sustainability. The study will provide guidance to Zanzibar on the techno-economic underpinnings for developing and integrating variable renewable energy technologies into the power system, and the possible implications on structuring of the ownership of storage and solar as a PPP.
Continue reading

Ethiopia Kicks Off Scaling Solar Round 2

On April 16, 2019, Ethiopia’s Public-Private Partnerships Directorate General (PPP-DG) solar-wind (CC0) Pixabay-Kenueonewithin the Ministry of Finance, formally initiated its Scaling Solar Round 2 tender by issuing a Request for Pre-Qualification (RFQ) for up to 500 MW of solar photovoltaic energy projects. Following this announcement, the PPP-DG expanded the RFQ from four to six projects with a total capacity of up to 750MW. In addition to the Weranso, Welenchiti, Humera, and Mekele sites announced on April 16, two more sites in Metema / Bahir Dar and Hurso were added.

Continue reading

eC2: Tanzania Pharmaceutical Competitiveness Strategy and Action Plan

Deadline: 21-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

The focus of this TOR is on the pharmaceuticals sector.
Scope of work780-439-amrcapture

1. Development of sector strategy and action plan
The focus of this contract is on phase II of the project: the development of a pharmaceutical sector strategy and action plan. While the contractor for this assignment is expected to suggest their own methodology for developing the pharmaceutical sector strategy and action plan, below is an indicative outline of some key stages and related outputs that are expected to be covered.

Continue reading

eC2: Integrated Transport System at the Foz do Rio Itajai region: Pre-Feasibility Engineering Study

Deadline: 16-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

The objective of this study is to carry out an engineering pre-feasibility analysis of a Buspe-bus-to-barranco-geraint-rowland-flickr Rapid Transit (BRT) project in the “Foz do Rio Itajai” metropolitan area in the State of Santa Catarina, Brazil. The project consists in the implementation of a greenfield BRT system with a network of five BRT corridors and six priority bus lanes, which is expected to support a ridership of 525,000 passenger trips per day by 2030. The objective of this study is to: (i) review and validate existing pre-feasibility engineering studies, (ii) further develop the preliminary project design, (iii) estimate capital and operational costs; and (iv) provide technical recommendations for the subsequent phase.

Continue reading

eC2: Assessment of the regulatory and legal framework for a PPP for the San Jose tramway in Costa Rica

Deadline: 15-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

The World Bank Group (WBG), with the support of the Global Infrastructure Facility PPPs(GIF), is selecting a legal firm (Consultant) to conduct a summary report and assessment on the regulatory and legal frameworks of Costa Rica, which may be relevant to a potential PPP for a greenfield Tramway project.

The Consultant will be entitled to develop a high-level report on the legal and regulatory framework in Costa Rica (national and municipal levels) relevant to structuring a potential PPP for the envisaged tramway project. The purpose of this activity is to support the WBGs decision on its potential involvement in the tramway project in the future.

The services include the following tasks:
1. Preliminary Due Diligence Report
2. Final Due Diligence Report
The assignment will be carried out over a period of 90 days.

Continue reading

eC2: Identification of local and regional market opportunities and end-market consumption of cocoa-based products for Cote d’Ivoire and Ghana

Deadline: 30-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) index

The objective of the assignment is to conduct an analysis of the local and regional market opportunities for cocoa-based products in the cluster cocoa production countries (Ghana, Côte dIvoire, Nigeria and Togo), and Senegal and Cape Vert the two (2) West African countries having the highest GDP per capita. More specifically, the study aims to:
– Identify and analyze the current local and regional market and potential opportunities for increased downstream uses of and end-market consumption of cocoa-based products;
– Perform an accurate market-sizing exercise for each of the different markets (i.e. Ghana, Côte dIvoire, and West African as a region) in terms of volume and value;
– Perform an analysis to determine the level of investment and capacity-building needed to develop these opportunities.

Continue reading

eC2: Independent Summative Evaluation (ISE) of the Global Partnership for Education (GPE) and of GPEs work associated with the GPE 2020 strategy

Deadline: 27-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) for-better-early-childhood-care-and-education-in-sri-lanka

A summary of the main supporting activities envisioned (though the consultants are invited to propose alternate arrangements) is below, but details will be elaborated in the request for proposals (RFP).
1. Throughout, participate in consultations seeking input from stakeholders, the IEC, the SIC, the Board, the GPE Secretariat, and GPE partners.
2.Based on the RFP guidance, further refine the evaluation questions and the methodological design as part of the inception note development.
3.Conduct the evaluation (reviewing existing data and reports and carrying out new data collection as necessary, developing and presenting progress reports and an intermediate report along the way).
4.Participate in review processes with the IEC and edit and refine the final evaluation and outputs.
5.Package all outputs for publication and presentation.
6.Present the findings in meetings about the evaluation.

Continue reading

eC2: Wastewater Management Facilities for Gazipur City Corporation, Dhaka, Bangladesh

Deadline: 13-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

Gazipur City Corporation (GCC), Greater Dhaka, with an objective to improve public untitledinfrastructure for wastewater management in the selected areas under its jurisdiction (Zones 1 and 4) plans to develop, operate and maintain following facilities:
– a Sewage Treatment Plant (STP) and a Fecal Sludge Treatment Plant (FSTP);
– a Sewerage Network System (SNS);
– a Centralized Effluent Treatment Plant (CETP) for industries; and
– a non-network fecal and sludge removal system in the non-sewerage areas.

Continue reading

eC2: Mauritania Water Sector: Institutional Diagnostic of the Central Directions and Structures (ONSER, CNRE) under the supervision of the MHA

Deadline: 09-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) water

The main objective of this study is to make a legal, institutional, organizational and technical (in terms of capacity) diagnosis of how the following institutions work and interact with one another to deliver drinking water and sanitation services to rural and semi-urban populations in Mauritania:
1. Directorate of Hydraulics
2. Directorate of Sanitation
3. Directorate of Hydrology and Dams
4. Policy, Monitoring and Cooperation Directorate
5. Regional Directorates of Hydraulics and Sanitation.
And the institutions under the supervision of the MHA which are:
6. ONSER
7. The CNRE
Based on this diagnosis, proposals for improving the organization, functioning and efficiency of these structures of the public water service will be formulated in the form of a functional reorganization plan of the MHA and the entities under its supervision. The ways and means needed to improve the interaction and cooperation between these various structures will also be laid down.

Continue reading

eC2: Africa CDC: Strengthening Regional Public Health Institutions and Capacity for Surveillance and Response (P168268)

Deadline: 06-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)medical-appointment-doctor-healthcare-clinic-health-hospital-medicine[7]

In recognition of the serious health challenges and the global dimension of the epidemic threats, the African Union Heads of States and Governments established the Africa Centers for Disease Control and Prevention (CDC) as a specialized agency of the African Union Commission and formally launched its operations on January 31, 2017.
The Africa CDC operates through three levels: (i) a secretariat based at the African Union headquarters (HQ) in Addis Ababa, Ethiopia; (ii) five Regional Collaborating Centers (RCCs) located in Egypt, Gabon, Kenya, Nigeria, and Zambia; and (iii) the National Public Health Institutes (NPHIs) and Centers of Excellence. To assure a coherent network between the RCCs, the NPHIs and Centers of Excellence, Africa CDC launched the Regional Integrated Surveillance and Laboratory Network (RISLNET) as an integrated platform for strengthening national and regional surveillance and laboratory systems; and harnessing existing public health assets for disease prevention.

Continue reading