eC2: Technical Consultant for a CCGT PPP Project in Uzbekistan

Deadline: 07-Jul-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

IFC is in discussion with the Government of Uzbekistan to be mandated as a lead

U.S. Electricity Output Rose 6.2% From A Year Earlier

transaction advisor for structuring and tendering of a PPP transaction involving financing, construction and operation of a 1,300 MW CCGT in Uzbekistan. IFC scope of work will include (i) legal, technical, E&S and financial due diligence, (ii) defining the transaction structure and preparing the tender documents (including calls for qualifications and proposals, and PPP contractual documentation), and (iii) ongoing support to the client throughout the implementation of the tender process, including any negotiations and discussions with investors.

Continue reading →

eC2: Solar PV generation at Central de Abastos, Mexico

Deadline: 18-Jun-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

Determine viable Business Models for the establishment of a photovoltaic energy solar-wind (CC0) Pixabay-Kenueonegeneration project at the Central de Abastos in Mexico City. This project will include the installation of solar panels and internal interconnection, as well as connection to the public network in common areas (existing ceilings and current roofless parking areas) with the objective of generating clean energy.

Continue reading →

Tracking SDG7: The Energy Progress Report 2019

STORY HIGHLIGHTS trackingsdg7-780-439
  • Global electrification rate reached 89 percent; the number of people without electricity access dropped to around 840 million, compared to 1 billion in 2016 and 1.2 billion in 2010.
  • Under current policies, an estimated 8 percent of global population will not have access to electricity in 2030, 90% of them will be in sub-Saharan Africa.
  • Stronger political commitment, long-term energy planning, increased private financing and adequate policy and fiscal incentives will be crucial to achieve universal access.

Continue reading →

Four Things You Should Know About Battery Storage

The global energy landscape is undergoing a major transformation. This year’s ict_day_card_1Innovate4Climate (I4C) will have a priority focus on battery storage, helping to identify ways to overcome the technology, policy and financing barriers to deploy batteries widely and close the global energy storage gap.

Here are four things about battery storage that are worth knowing.

Continue reading →

New World Bank Fund to Support Climate-Smart Mining for Energy Transition

The World Bank launched the Climate-Smart Mining Facility on May 1st, the first-ever fund dedicated to making mining for minerals climate-smart and sustainable. The Facility will support the sustainable extraction and processing of minerals and metals used in clean energy technologies, such as wind, solar power, and batteries for energy storage and electric vehicles. It focuses on helping resource-rich developing countries benefit from the increasing demand for minerals and metals, while ensuring the mining sector is managed in a way that minimizes the environmental and climate footprint.

 

Continue reading →

eC2: CONSULTING SERVICES TO IDENTIFY FUTURE SMART GRID OPTIONS AND ROADMAP FOR TEIAS TRANSMISSION NETWORK

Deadline: 18-Apr-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) India Energy

The shortlisting criteria are:
Experience in transmission network levels design, implementation, and/or operation relating to substation protection system, SCADA system, and/or status monitoring system in a central dispatching center. Primary nominal voltage shall be equal to or higher than 220kV.

Continue reading →

eC2: Technical consultant – Electricity Markets

Deadline: 14-Apr-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

U.S. Electricity Output Rose 6.2% From A Year Earlier

The International Finance Corporation (IFC part of the World Bank Group) is in preliminary discussions with the Government of Northern Macedonia, assess the bankability and support the development of a greenfield pumped-storage hydropower plant.  Within the context of this potential engagement, IFC expects the need to perform a least-cost electricity generation and storage assessment of Northern Macedonia and neighboring countries, and economic analysis of the proposed project, and is seeking expressions of interest from experienced technical consultants (or consortia of consultants) with experience in electricity market design / assessment and renewable power generation.

Continue reading →

eC2: Brazil Street Lighting PPP. Consultants Expertise: PMO; Technical Street Lighting; Economic-Financial modeling.

Deadline: 30-Mar-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)  PPPs

The International Finance Corporation (IFC), a member of the World Bank Group, has been mandated by the Federal Government of Brazil (GoB), through CAIXA, its state-owned development bank (the Client) to provide lead transaction advice on the development and implementation of a Public-Private Partnership (PPP or the Project) to improve the delivery of public lighting for up to 6 Municipalities (Municipalities). IFC is now looking to hire a consultant (Consultant) to work throughout the development of the transaction with expertise in: (i) Project Management Office; (ii) Technical Street Lighting, including Artistic and Special Areas Lighting; and (iii) Economic-Financial modeling.

Continue reading →

eC2: Small Hydropower Mapping in Myanmar

Deadline: 21-Mar-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) HYDRO

Myanmar is in a substantial need for new power generation capacities. The country has the lowest grid connected electrification rate in Southeast Asia, with only 42% of the population supplied. It is estimated that at least 500 MW of additional generation capacity is required to come on line annually up to 2030 to meet the growing domestic demand. Although the country has abundant freshwater resources, the hydropower sector has experienced relatively limited development compared to the identified potential total capacity. To date, no reliable information on Myanmar’s available small- and medium-size HPP potential is available, neither a comprehensive database on planned, under development and commissioned plants of these capacities exist. Therefore, in order to assess the options for development of greenfield small- and medium-size hydropower plants in Myanmar, IFC intends to collect information, prepare a database and map all HPPs in the country with the capacity between 2-30 MW.

Continue reading →

eC2: The State of Access to Modern Energy Cooking Services

Deadline: 24-Mar-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) cookstoves

The objective of this activity is to update the understanding of the cooking sector, bringing together in one document a summary of key challenges, opportunities, barriers, and solutions toward achieving universal access to modern energy cooking services by 2030.

Continue reading →