Deadline: 18-Apr-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)
The shortlisting criteria are:
Experience in transmission network levels design, implementation, and/or operation relating to substation protection system, SCADA system, and/or status monitoring system in a central dispatching center. Primary nominal voltage shall be equal to or higher than 220kV.
You must be logged in to post a comment.