eC2: Small Hydropower Mapping in Myanmar

Deadline: 21-Mar-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) HYDRO

Myanmar is in a substantial need for new power generation capacities. The country has the lowest grid connected electrification rate in Southeast Asia, with only 42% of the population supplied. It is estimated that at least 500 MW of additional generation capacity is required to come on line annually up to 2030 to meet the growing domestic demand. Although the country has abundant freshwater resources, the hydropower sector has experienced relatively limited development compared to the identified potential total capacity. To date, no reliable information on Myanmar’s available small- and medium-size HPP potential is available, neither a comprehensive database on planned, under development and commissioned plants of these capacities exist. Therefore, in order to assess the options for development of greenfield small- and medium-size hydropower plants in Myanmar, IFC intends to collect information, prepare a database and map all HPPs in the country with the capacity between 2-30 MW.

See full tender here: Small Hydropower Mapping in Myanmar

eConsultant2 website: https://wbgeconsult2.worldbank.org/wbgec/index.html

Tender notification: # 1261707

Assignment Countries:

  • MM – Myanmar

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s