Deadline: 13-Jul-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
The assignment output is expected to inform the Government of Niger, NIGELEC and the
World Bank for the design of a World Bank-financed project component that aims to hybridize with PV and expand access to electricity in some of the existing micro-grids (centres isolés) operated by NIGELEC in throughout Niger.
The selected consultant firm will conduct a phased feasibility study of the potential options for hybridization and expanding access to electricity (households, businesses, etc.) of these mini-grids. Options for hybridization may include PV and options for storage capacity during night hours (batteries or diesel). After a first screening of the potential of the mini-grids to be hybridized and agreed technology option, the Consultant will conduct the feasibility studies (including demand assessments) of the selected mini-grids.
African countries to explain why independent power projects (IPPs) are crucial to help deliver electricity to the 600 million people without it in Sub-Saharan Africa. The report highlights the challenges policymakers face and factors that can lead to scaled-up and sustainable power sector investment.




standard of fecal sludge removal, transport and disposal services by developing sustainable and affordable fecal sludge management solutions at city level and in low incomes areas. These solutions will inform the future development of a comprehensive and integrated sanitation master plan for the whole city. The present assignment is divided into two (2) components as follows: Component 1: Updated diagnostics and preliminary recommendations at city level and in low income areas; and, Component 2: Detailed pilot project design in selected areas.