eConsultant2: Feasibility study of PV hybridization of diesel-based mini-grids in Niger

Deadline: 13-Jul-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

The assignment output is expected to inform the Government of Niger, NIGELEC and the AfricaWorld Bank for the design of a World Bank-financed project component that aims to hybridize with PV and expand access to electricity in some of the existing micro-grids (centres isolés) operated by NIGELEC in throughout Niger.
The selected consultant firm will conduct a phased feasibility study of the potential options for hybridization and expanding access to electricity (households, businesses, etc.) of these mini-grids. Options for hybridization may include PV and options for storage capacity during night hours (batteries or diesel). After a first screening of the potential of the mini-grids to be hybridized and agreed technology option, the Consultant will conduct the feasibility studies (including demand assessments) of the selected mini-grids.

See full tender here: Feasibility study of PV hybridization of diesel-based mini-grids in Niger

eConsultant2 website: https://wbgeconsult2.worldbank.org

Tender notification: #1223147

Assignment Countries:

  • NE – Niger

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s