Deadline: 14-Nov-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)
The assignment will focus on a number of islands (targeting a total of 10-12) based on the
following criteria (a) the size of PLN grid (5-150MW); (b) high average generation cost; and (c) electrification rate below 90%. The selected islands will be communicated to the Consultant before the start of the assignment. They are all located in the Eastern Islands and were divided into three groups, (i) islands with a small installed generation capacity and limited electrification, (ii) islands with an installed generation capacity of 50-150 MW with only diesel generation and very high average generation cost and (iii) islands with an installed generation capacity of 50-150 MW with diesel and coal generation and high average generation cost.




people jostling each other as they head to work? And what comes to mind when you think of an Eastern Caribbean island? Sun, sand, beaches paradise? Yet, Eastern Caribbean countries also have cities of thousands of people. In 2017, 35% of the Eastern Caribbean* population was urban: 221,000 out of 628,000 people lived in cities.

San Salvador de Jujuy, Argentina, as part of the World Bank’s City Resilience Program. Specifically, the consultancy will focus in the Chijra River. The expected tasks include:
You must be logged in to post a comment.