eC2: Indonesia: Least-Cost Planning and Dispatch Diagnosis in Eastern Islands

Deadline: 14-Nov-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)

The assignment will focus on a number of islands (targeting a total of 10-12) based on theindex following criteria (a) the size of PLN grid (5-150MW); (b) high average generation cost; and (c) electrification rate below 90%. The selected islands will be communicated to the Consultant before the start of the assignment. They are all located in the Eastern Islands and were divided into three groups, (i) islands with a small installed generation capacity and limited electrification, (ii) islands with an installed generation capacity of 50-150 MW with only diesel generation and very high average generation cost and (iii) islands with an installed generation capacity of 50-150 MW with diesel and coal generation and high average generation cost.

See full tender here: Indonesia Least-Cost Planning and Dispatch Diagnosis in Eastern Islands

eConsultant2 website: https://wbgeconsult2.worldbank.org/wbgec/index.html

Tender notification: #1259782

Assignment Countries:

  • ID – Indonesia

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s