eC2: Technical support for the preparation of Flood Risk Management Plans for Romania. Methodology for the elaboration of Flood Hazard Maps for Romania

Deadline: 05-Mar-2020 at 11:59:59 PM (Eastern Time – Washington D.C.) water

The assignment aims to develop methodologies to elaborate the flood hazard maps for Areas of Potential Significant Flood Risk reported to the European Commission in 2019 (APSFR II). It will involve the following tasks: 1.Collate and review existing information on APSFR from cycle I and II, Flood Hazard Maps I and methodology. 2.Set out a clear overall integrated methodological framework for hazard mapping with specific methodologies for different types of flood hazards (Flash Floods, Pluvial Floods in urban areas, Coastal flooding, flooding due to dyke breaches)identified under the APSFR II. This framework is to be aligned with the methodology used during the first cycle for FHMs from fluvial source, will consider the comments received from the European Commission in the first cycle and international best practices. 3.Propose a method to integrate expected impacts of climate change into the development of the new Flood Hazard Maps and for using the existing Flood Hazard Maps of cycle 1

Continue reading

eC2: Understanding urban flood risk in Jujuy, Argentina

Deadline: 31-Oct-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)

The World Bank is seeking consultant services to analyze urban flood risk in the city ofpexels-photo-831890.jpeg San Salvador de Jujuy, Argentina, as part of the World Bank’s City Resilience Program. Specifically, the consultancy will focus in the Chijra River. The expected tasks include:
1. Diagnosis of current situation including compiling, preparing, complementing and / or updating existing information.
2. Develop a Digital Terrain Model for the whole basin using the existing information.
3. Analysis of hydrological aspects; mainly the review of the studies available within the basin and close to it, considering the historical values and the climatic tendencies indicated in the recent history.
4. Construction of a 1D hydrodynamic model for the area based on the MDT.
5. Evaluate the possibility of calibration of the models with background information.
6. Prepare the base cartography of the area based on the available information.
7. Define the design events for the exploitation of the hydrodynamic model.
8. Draw the flood lines for the different scenarios.
9. Analyze sediment transport at basin level.
10. Identify erosion / sedimentation zones.
11. Identify existing infrastructures that affect natural runoff.
12. Identify population and infrastructure exposed to risk.
13. Identify mitigation works for both floods and erosion / sedimentation phenomena.

The assignment and all deliverables will be in Spanish.

Continue reading

eC2: Investment Funding Mechanisms and Institutional Set-up Options for a National Urban Flood Risk Investment Program for Indonesian Cities

Extended deadline!

Deadline: 23-Oct-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)

The World Bank is supporting the Government of Indonesia to address critical urban indonesiaflood risk management and investment needs in Indonesia. This technical assignment will assist with the development of a conceptual framework design for a national urban flood risk reduction investment program, which could comprise risk reduction investments, technical capacity building, knowledge sharing, and innovation generation. The key output will be a conceptual framework and sustainable implementation model for the proposed program that addresses the identified needs through proposed financial and organizational arrangements; makes recommendations for any needed regulatory/institutional/financial arrangements; and propose an overall action plan and timeline to put the program into effect. The team will be expected to provide technical advice on public financial management, municipal finance, disaster risk management, flood risk management, and urban development.

Continue reading

eC2: Investment Funding Mechanisms and Institutional Set-up Options for a National Urban Flood Risk Investment Program for Indonesian Cities

Deadline: 09-Oct-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)

The World Bank is supporting the Government of Indonesia to address critical urban indonesiaflood risk management and investment needs in Indonesia. This technical assignment will assist with the development of a conceptual framework design for a national urban flood risk reduction investment program, which could comprise risk reduction investments, technical capacity building, knowledge sharing, and innovation generation. The key output will be a conceptual framework and sustainable implementation model for the proposed program that addresses the identified needs through proposed financial and organizational arrangements; makes recommendations for any needed regulatory/institutional/financial arrangements; and propose an overall action plan and timeline to put the program into effect. The team will be expected to provide technical advice on public financial management, municipal finance, disaster risk management, flood risk management, and urban development.

Continue reading

eC2: Action Planning for Social Inclusion in Disaster Risk Management Portfolio in South Asia

Qiangtang River BasinDeadline: 22-Jul-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)

The World Banks South Asia Disaster Risk Management (DRM) team has commenced a new regional Technical Assistance (TA): Mainstreaming Inclusive Resilience in South Asia (P167456), to proactively incorporate social inclusion in the existing and new DRM lending portfolio. The objectives of this assignment are: (a) to develop action plans for five pilot projects, that are either new or existing, to better address social inclusion in the project design/implementation stage; and (b) to design and deliver training workshops that help government counterparts and World Bank’s DRM and Social Development specialists, to design more socially inclusive DRM projects. Under this assignment, two activities are planned: (i) action planning to identify practical entry points for more robust social inclusion elements in the five pilot projects; (ii)training workshop for consultation and learning opportunities.

Continue reading

Flooded rivers: taking a bird’s eye view

Floodplains are attractive areas for development, with over 2 billion people living within the world’s 10 largest river basins. Yet, they are also at particular risk from overflowing rivers. Globally, river floods affect more than 21 million people. By 2030, due to climate change, population growth, and rapid urbanization, this number could rise to 54 million.

How can we enjoy the benefits these locations bring, without putting ourselves at unnecessary danger from floods?

While it is impossible to fully eliminate flood risk, actions can be taken to minimize the impact.

A proactive river basin-wide approach to flood risk management may be one of the solutions.

Continue reading

Article: Reviving Flood-Ravaged Livelihoods in Malawi

Article published on http://www.worldbank.org on November 29, 2016

STORY HIGHLIGHTS
  • In 2015, about half of Malawi’s 29 districts were hit by floods, destroying agriculturalImage

    livelihoods, leaving more than 1,150,000 people affected and 336,000 displaced

  • With $80 million in support through IDA, the World Bank has helped to restore livelihoods through providing agricultural inputs, rebuilding irrigation schemes, and stocking the national grain reserve
  • With community grain banks, families are now able to take care of themselves and are feeling less vulnerable to future disasters.

Continue reading

eC2: Development of a National Early Warning Platform for Rwanda and a Flood Early Warning system

Deadline: 19-Dec-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

 

A consulting firm is being sought to develop and operationalize a national platform to watersupport data sharing, analysis, visualization and decision making (for example through automated alert triggering) in support of a shared early warning approach between MIDIMAR, RMA, RNRA, and District government teams. While the focus of this support will be at the national level, the firm will also develop a local early warning system utilizing the national platform in the Sebeya Basin.

To complete the Sebeya Basin flood early warning system, the firm will also develop and operationalize a flood forecasting system in the basin. The firm will provide technical expertise on flood hazard assessment, particularly hydraulic/hydrological modeling, flood hazard mapping and operational flood forecasting, also to support capacity building of the appropriate agencies at the national and local levels.

Continue reading

eC2: Flood Risk Management Plan for the Sava River Basin – Int’l Firm

Deadline: 03-Oct-2016 at 11:59:59 PM (Eastern Time – Washington Dwater.C.)

The overall objective is to improve the quality and effectiveness of joint flood and drought management and forecasting capacities in the SRB. This particular projects component aims at fostering cooperation among the countries which share the Sava RB through preparation of the Sava FRMP. Sava FRMP shall ensure a coordinated planning of measures and support the implementation of joint activities of the countries cooperating in SRB aimed at creating the conditions for sustainable flood protection in the basin.

Continue reading