eC2: Malawi National Electrification Strategy

Deadline:  01-Aug-2017 at 11:59:59 PM (Eastern Time – Washington D.C.)India Energy

The objective of the proposed activity is to prepare a National Electrification Strategy (NES) for Malawi along with an NES implementation plan to support the national electricity access agenda. The NES will lay out the technical, institutional, and financial pathway to achieve Malawi’s access vision. The World Bank is seeking expressions of interest for conducting the activity. Interested firms are requested to submit the same highlighting their qualifications for undertaking the assignment based on the required criteria.

Continue reading

eC2: Multi-stakeholder platform for knowledge sharing on access solutions for innovative medicines

Deadline:  03-Aug-2017 at 11:59:59 PM (Eastern Time – Washington D.C.) medical-appointment-doctor-healthcare-clinic-health-hospital-medicine[7]

The initial scope and purpose of the multi-stakeholder platform for knowledge sharing on access solutions for innovative medicines (henceforth, the Platform) will be to develop and share knowledge and tools for smarter decision making on access strategies for patented medicines for NCDs, through a collaborative approach. The Platform will leverage the pharmaceutical industry’s capacity for developing innovative access solutions and the World Banks role as a strategic long term partner for developing countries and its convening power, to create a reference policy and implementation framework and decision-making tools for maximizing reach of new treatments for populations that typically would not have access to patented medicines, ultimately driving uptake of voluntary access strategies in developing countries.

The Platforms work will be structured along four activities: Activity I: Catalog and evaluate existing medicines access programs. Activity II: Co-create new evidence for smarter decision making in the LMICs context, using a using modeling exercise in which “good practice” access strategies are developed for different types of medicines (hypothetical molecules) in different markets. Activity III: Develop a compendium of good practices for access strategies. Activity IV: Support dissemination and use of results

Continue reading

eC2: Assessment and Economic Valuation of Coastal Protection Services Provided by Mangroves

Deadline:  25-Jul-2017 at 11:59:59 PM (Eastern Time – Washington D.C.) th

The services included in the study are to be conducted in accordance with generally accepted international standards and professional practices acceptable to the Gov of Jamaica and the World Bank. The scope of work is understood to cover all activities necessary to accomplish the objectives of the consultancy, whether or not a specific activity is cited in these Terms of Reference. Physical measurements of mangrove ecosystems are essential to provide the basis for an analysis of habitat quality, ecosystem service provisioning and habitat risk assessment. These measures could also contribute to an evaluation of the explicit role of nature within the disaster risk equation, and thus help point to the role that nature has in mediating societal vulnerability and how nature can help reduce climate and disaster risk. The activity will select contrasting sites with different physical, ecological, social and governance characteristics to conduct specific measurements of mangroves habitats and evaluate their role in coastal disaster risk reduction.

Continue reading

eC2: Port Sudan Water Supply: Water resource management at Arbaat dam

Deadline: 01-Aug-2017 at 11:59:59 PM (Eastern Time – Washington D.C.) water

The State Water Corporation (SWC) for Red Sea State manages water supply for the city of Port Sudan. The city relies on two critical sources Arbaat Dam (which is under threat from siltation) and Arbaat well field. A new well field at Moj is also a potential source. This assignment aims to generate high quality data on the following: At Arbaat Dam & At Arbaat and Moj Wellfields. Outputs: A water resource monitoring report that includes a model of the sediment dynamics of the main catchment area (by Sep 2018). On-the-job-training and training manual for technical staff at SWC with responsibilities for the managing water resources for Port Sudan water supply (by Jun 2018)

Continue reading

eC2: Cumulative impacts of hydropower in the Kuri-Gongri River in Bhutan

Deadline:  03-Aug-2017 at 11:59:59 PM (Eastern Time – Washington D.C.) HYDRO

The consultancy services will involve a study on cumulative impacts of hydropower in Kuri-Gongri River Basin. An inventory of all major water uses will be conducted for the Kuri-Gongri River basin in Bhutan, which hosts almost half of the total hydropower potential of Bhutan. This will include the use for hydropower, agriculture, water supply, as well as for environment, social and cultural purposes. Cumulative impacts of water uses and infrastructure development will be studied and quantified. The assignment will be conducted on a rapid basis during a period of nine months starting from October 2017. The estimated work input is 120 staff weeks of which at least 30% should be local expertise.

Continue reading

Vietnam, World Bank and the Netherlands to cooperate on food safety

P_8_QXGN

Attached a picture of Ousmane Dione and Nathan together with the Prime Ministers Phuc of Vietnam and Rutte of the Netherlands this Monday at the Catshuis (local equivalent of the White House) in The Hague, signing a trilateral MoU regarding collaboration on food safety. A spin-off under the WBG-NL Food for All Partnership. Great work by the Country Office and the Dutch Embassy Hanoi.

Continue reading

New World Bank Group Facility to Enable more than $1 billion for Women Entrepreneurship

HAMBURG, Germany, July 8, 2017—On the occasion of the G20 leaders’ summit, the nasikiliza-unleashing-the-potential-of-women-entrepreneurs-in-africa-feature-780x439World Bank Group today announced the creation of an innovative new facility that aims to enable more than $1 billion to advance women’s entrepreneurship and help women in developing countries gain increased access to the finance, markets, and networks necessary to start and grow a business.

The United States initiated the idea for the facility and will serve as a founding member along with other donor countries.

Continue reading

eC2: Decision Tree Initiative – Multidimensional Risk Management of Flood Protection Infrastructure & Irrigated Cropland Expansion

Deadline: 20-Jul-2017 at 11:59:59 PM (Eastern Time – Washington D.C.) water

The Government of Kenya (GoK) is partnering with the International Development Association (IDA) of the World Bank to develop and implement the Kenya Water Security and Climate Resilience Program (KWSCRP). The detailed design for the LN irrigation scheme and flood dikes, will be completed for review by May 7, 2017, and construction contracts award expected in October -November 2017. The client is very interested in the climate change risk assessment and management for the flood protection infrastructure and irrigated cropland expansion as well as the resilience level of the integrated flood risk management system. The overall objective of the consultancy is to quantitatively assess the climate change risk vis-à-vis other risks unrelated to such change, followed by guidelines for a phased adaptation leading to increased resilience of the integrated Nzoia River Flood Program and irrigated expansion using the Decision Tree Framework.

Continue reading

eC2: E-WASTE MANAGEMENT PROGRAM INDIA

Deadline:  27-Jul-2017 at 11:59:59 PM (Eastern Time – Washington D.C.) th

The IFC project aims to support the development of an e-waste management solution for the electronics industry to address the challenge of responsible collection and recycling of electronic waste in India at scale and in a cost-effective manner. The goal of the IFC project is to work with private sector entities such as Producer Responsibility Organizations (PROs) and Industry Associations and waste management companies to establish a long-term solution to the e-waste challenges in India that the electronics sector as well as consumers face. The fundamental objectives of the Project are to (i) establish an Industry-led Solution for electronic producers to responsibly manage, collect and ensure responsible recycling of obsolete or discarded electronic products (e-Waste), (ii) Raise awareness among the public and other key stakeholders on the need of responsibly collect and recycle e-waste, and (iii) develop a locally relevant system for responsible e-waste management in India and a toolkit for dissemination of learnings from the Project.

Continue reading