eC2: Cumulative impacts of hydropower in the Kuri-Gongri River in Bhutan

Deadline:  03-Aug-2017 at 11:59:59 PM (Eastern Time – Washington D.C.) HYDRO

The consultancy services will involve a study on cumulative impacts of hydropower in Kuri-Gongri River Basin. An inventory of all major water uses will be conducted for the Kuri-Gongri River basin in Bhutan, which hosts almost half of the total hydropower potential of Bhutan. This will include the use for hydropower, agriculture, water supply, as well as for environment, social and cultural purposes. Cumulative impacts of water uses and infrastructure development will be studied and quantified. The assignment will be conducted on a rapid basis during a period of nine months starting from October 2017. The estimated work input is 120 staff weeks of which at least 30% should be local expertise.


See full tender here: Cumulative impacts of hydropower in the Kuri-Gongri River in Bhutan

eConsultant2 website: https://wbgeconsult2.worldbank.org

Tender notification: # 1246900

Assignment Countries:

  •     BT – Bhutan

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s