Deadline: 03-Aug-2017 at 11:59:59 PM (Eastern Time – Washington D.C.)
The consultancy services will involve a study on cumulative impacts of hydropower in Kuri-Gongri River Basin. An inventory of all major water uses will be conducted for the Kuri-Gongri River basin in Bhutan, which hosts almost half of the total hydropower potential of Bhutan. This will include the use for hydropower, agriculture, water supply, as well as for environment, social and cultural purposes. Cumulative impacts of water uses and infrastructure development will be studied and quantified. The assignment will be conducted on a rapid basis during a period of nine months starting from October 2017. The estimated work input is 120 staff weeks of which at least 30% should be local expertise.
You must be logged in to post a comment.