Deadline: 31-Dec-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)
To enhance connectivity and attract more public and private investments for
infrastructure in ASEAN, MPAC 2025 recommended the establishment of a rolling priority pipeline list of potential ASEAN infrastructure projects and sources of funds.
The Initial Pipeline consists of 16-20 projects submitted by the ASEAN Member States and selected and prioritized by the World Bank based on a screening and scoring process assessing key project factors such as strategic relevance, impact on regional connectivity, environmental and social impact, project feasibility, and the contracting agency’s implementation capacity.
In the next phase, the World Bank will undertake a financing options analysis of each of the projects in the Initial Pipeline to determine the best procurement option for the project i.e., to determine whether the project should be publicly funded, privately financed or funded/financed through a Public Private Partnership. Where a project already has a robust and recently conducted pre-feasibility or feasibility study, the information and data required to undertake such analysis should already be available. However, for those projects that do not have such a study available, it will be necessary to undertake the relevant studies and review.
firms to supply drone and street-view imagery data collection services in a secondary city in Indonesia. For the street view images, the firm will be expected to use both a car mounted camera as well as more portable 360-degree devices. For the drone images, the size of the area of interest (AOI) will total roughly 80 square meters, however the data can be parsed into manageable sized mosaics.
awareness and capacity of relevant Government of Indonesia line agencies in developing DRM and climate adaptation plans for water supply infrastructure, particularly to address seismic and hydro-meteorological (floods, droughts and landslides) risks. The key objectives are to: (i) develop a technical report that outlines guidance on how to address DRM and climate adaptation aspects in water supply infrastructure; (ii) develop a set of technical guidelines and standard operating procedures that will assist PDAMs to prepare DRM and climate adaptation plans; and (iii) provide technical assistance to AKATIRTA and/or MPWH’s Balai Teknik Air Minum (BTAM) to increase their capacity in delivering trainings and education programs in the design and operation of resilient water and sanitation infrastructure.
following criteria (a) the size of PLN grid (5-150MW); (b) high average generation cost; and (c) electrification rate below 90%. The selected islands will be communicated to the Consultant before the start of the assignment. They are all located in the Eastern Islands and were divided into three groups, (i) islands with a small installed generation capacity and limited electrification, (ii) islands with an installed generation capacity of 50-150 MW with only diesel generation and very high average generation cost and (iii) islands with an installed generation capacity of 50-150 MW with diesel and coal generation and high average generation cost.
–public and private sector attendees–gathered at our
funding of up to $1 billion for the Government of Indonesia to supplement relief and reconstruction efforts in the disaster-affected areas of Lombok and Sulawesi, and to bolster long-term resilience.
Fund (IMF) hold Annual Meetings to discuss a range of issues related to poverty reduction, international economic development and finance. This year’s events will take place in Nusa Dua, Bali, Indonesia, October 8-14, 2018. Start planning your