Deadline: 26-Jun-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)
Burundi has over 900 health centers and more than 1,400 secondary and vocational schools, out of which the majority is not electrified. The World Bank seeks to hire the services of a firm to i) take stock of the electrification status and overall energy use of Health and Education Facilities in Burundi and ii) to design standardized solar-powered service packages to meet their current and future needs. The assignment should assess a representative share of those unelectrified facilities. A particular emphasis will be put on ways to ensure maintenance and operation of the systems, as one of the big challenges for long-term project success.
You must be logged in to post a comment.