eC2: Detailed PV Integration Studies in Guinea

Deadline:  27-Nov-2018 at 11:59:59 PM (Eastern Time – Washington D.C.) solar-wind (CC0) Pixabay-Kenueone

Guinea has a potential variable solar resource according to the regions. Guinea is positioning itself to become a major producer of electricity by 2021, aiming for the export of a large part of its production to its neighbors Mali, Senegal and Guinea-Bissau. In this perspective, it wants to study the possibility of integrating a large fleet of solar power plants on its network. This detailed study for the integration of solar projects in Guinea will be used to undertake the following main objectives:
Study of the capacity reserve for frequency regulation and realization of an economic Dispatch study. Update of the integration study. Diagnosis and Evaluation Investments for the Strengthening and Modernization of the Dispatch Center

See full tender here: Detailed PV Integration Studies in Guinea

eConsultant2 website: https://wbgeconsult2.worldbank.org/wbgec/index.html

Tender notification: # 1259666

Assignment Countries:

  • GN – Guinea

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s