ASSESSMENT AND PLAN FOR SMALL PIPED WATER SYSTEMS IN DAR ES SALAAM

Deadline: 04-Apr-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

waterThe objective of this assignment is review the existing Small Piped Water Systems in the city, identify the lessons learnt from their implementation, and based on the
se, identify a strategy and plan to extend the SPSs to cover the other unserved areas of Dar es Salaam
city. Continue reading

eConsultant2: Soil and Leaf Testing – KTDA tea zones

Deadline: 12-Apr-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

IFC is working with KTDA to develop a soil and leaf testing program acros_DSC0993s the firms production area. This program will collect a statistically valid set of soil and leaf samples from each major soil type. Analysis of these samples will identify macro and micro soil nutrient deficiencies, which will be addressed through the development of improved fertilizer blends and application recommendations.

Continue reading

eConsultant2: Sectoral Studies and Design Options for Carbon Pricing Instruments

Deadline: 28-Apr-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

The purpose of the consultancy to be contracted is to propose packages of carbon pricing Financial Educationinstruments and possible adjustments to existing sectoral policy instruments to maximize the economic efficiency of implementing the post-2020 PNMC objectives. The macroeconomic impacts of the proposed instrument packages will be assessed in MRP Component.

Continue reading

PPP Support to the Nile Equatorial Lakes Subsidiary Action Program (NELSAP)

Deadline: 08-Apr-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

This consultancy will support NELSAP-CU in exploring the development of PPPsPPP options. The consultancy will conduct a screening of NELSAPs portfolio for PPP-suitable projects and pilot up to three for early project preparation.

 

Continue reading

eConsultant2:Gas Infrastructure Optimization and Investment Framework

Deadline: 30-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

As part of the on-going energy sector dialog between the World Bank and the GoGASvernment of Indonesia, the World Bank seeks an international consulting firm to develop an optimized plan for gas infrastructure development in Indonesia and an integrated framework for investment and financing of gas infrastructure.

Continue reading

eConsultant2: Morocco Lighting Transformation Program

Deadline: 03-Apr-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

The Program will contribute to the energy efficiency transformation of Moroccos Public solar-energyLighting through the effective implementation of a carefully chosen and integrated mix of project components. This is intended to be achieved by identifying and developing appropriate mechanisms for addressing and removing several market and institutional barriers that are currently restricting the adoption and implementation of energy efficient technologies and practices in the public sector, such as the lack of awareness and incentives, insufficient implementation capacity, and limited access to financing.

Continue reading

eConsultant2:Dairy Specialist

Deadline: 05-Apr-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

Objective/Purpose of Assignment:
The Project will look at limited access to finance for farmers/producers from 2 Koeien in de weiperspectives: lack of skills/knowledge (of risks in agriculture and availability of relevant tools) in FIs and low bankability of farmers/producers due to lack of capacity and lack of avenues to improve this capacity. To address this failure on the scale of the selected FIs and supply chains, the Project will work with both FIs and supply chains (aggregators, producers, other participants) to improve their capacity and created strong linkages between all.

Continue reading

eConsultant2: Preparation of a National Electrification Strategy and Plan for Mozambique

Deadline: 08-Apr-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

The Government of Mozambique has asked for Bank support to assist them in defining India Energyand implementing a National Electrification Strategy that enshrines the sustainable development of the energy sector. The consultant is intended to provide analysis and policy advice tailored to the specific needs of Mozambiques energy sector. The work is expected to describe the current institutional and operation model, identify its strengths and weaknesses and generate solid sector diagnostics and identify practicable action plans to consolidate and operationalize reforms and ultimately help achieving the fast while sustainable electricity access for the Mozambican people.

Continue reading

eConsultant2: Options Paper on Power Sector Development in Mozambique

Deadline: 08-Apr-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

The Government of Mozambique (GoM) together with Electricidad de Mozambique (EdM) Energy Indiahave a variety of power generation projects to drive its power sector development and take advantage of trading opportunities arising in the region. The GoM recognizes that its challenge is to maximize the net benefits to the country from power generation development by:
a. Maximizing revenue inflows over time from export projects while still attracting high quality developers;
b. Ensuring that domestic energy needs are effectively met; and
c. Minimizing the risks and costs of power generation projects by effective selection, prioritization, contracting, management, and enforcement.

Continue reading

eConsultant2: Sr. PPP Advisor and Coordinator

Deadline: 01-Apr-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
PPPs

The key objectives of this assignment would be to:Act as an integrator for all various component. Work closely with the Government on the PPP unit implementation.
Assist, review and assess the PPP potential for SOEs .Ensure Quality control of the program.

Continue reading