The World Bank’s inaugural Data Day had something for everyone and was a huge win
for data: more than 1,000 participants voted with their feet and their time to show their commitment for data—and that’s a commitment we share. Here’s what we learned from our first Data Day:
Tag Archives: World Bank Group
eC2:Determination of the capacity of water bodies to take nutrient pollution
Deadline: 02-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)
The assignment comprises of three main activities:
Activity 1: Identification and quantification of the factors determining the self-purification ability of different types of water bodies of categories river, lake and transitional waters
Activity 2: Identification of the impact of different concentrations of nutrients (nitrogen and phosphorus forms) on the ecological status of the different types of water bodies of categories river, lake and transitional waters
Activity 3: Development, testing and validation of methodology/mathematical models for determining the capacity of different types of water bodies of categories river, lake and transitional waters
eC2: Dairy Farm Engineering Consultant
Deadline: 02-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) 
IFC is hiring a Consultant (a firm), which will support the Project team on the evaluation of two existing dairy farm facilities and on providing conceptual designs as well as the drawing and specification for the selected designs of two small-scale dairy farms in Ukraine.
Shedding light on the informal economy: A different methodology and new data
In Mozambique’s three largest cities (Maputo, Beira, and Nampula), informal
businesses—those operating outside formal licensing and registration procedures—outnumber formal firms by a factor of 9 to 1. The World Bank’s Enterprise Analysis Unit recently published surveys of informal businesses in Mozambique, conducted in collaboration with the country management unit and colleagues from the Finance, Competition, and Innovation Global Practice. These surveys were designed to mirror the standard World Bank Enterprise Surveys, which cover the formal sector, but were tailored to better understand the unique conditions in which informal firms operate. Thanks to recent methodological innovation in sampling techniques, these surveys now also provide an estimate of the total number of informal businesses.
eC2: National Electrification Analysis: Assessment of Electrification Options for Angola
Deadline: 02-May-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

The Government of Angola (GoA) has requested support from the World Bank Group to complete a National Electrification Analysis (NEA), addressing all key aspects of investment planning, institutional and contracting arrangements, and needed financing and regulations for providing reliable electricity service, ultimately achieving the national electricity access targets. Thus, the World Bank Group is seeking to hire a consulting firm or consortium to help complete the NEA. The scope of work encompasses: (a) preparation of a geographic information system (GIS)-based database; (b) identification of least-cost electrification options based on different locations/density levels/electricity needs; and (c) identification of suitable implementation options for scaling up electrification in Angola in line with national electricity access targets.
Spring Meeting Recap
Did you the miss the Spring Meeting Events? 
President David Malpass opening remarks.
Each Spring, the Boards of Governors of the World Bank Group and International Monetary Fund (IMF) hold Spring Meetings to discuss a range of issues related to poverty reduction, international economic development and finance. World Bank Live brings #WBGMeetings experience straight to you wherever you are in the world.
World Bank/IMF Spring Meetings 2019: Development Committee Communiqué
eC2: Social Protection Fund Flow Analysis
Deadline: 22-Apr-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) 
The objective of this assignment is to map the process and trace the actual flow of funds for select social safety net programs implemented by the Government of Bangladesh, from the central level to the hands of the beneficiaries.
Paying for development – Governments are sitting on a ‘goldmine’
Investments in human, social, and physical capital are at the core of sustainable and inclusive growth – and represent an important share of national budgets.
At the World Bank Group we have been at the forefront of the so-called Financing for Development (FfD) agenda to leverage public, private, international, and domestic sources of capital to help reach the global goals. A short primer on our efforts–which builds on the 2015 Development Committee paper Billions to Trillions – Transforming Development Finance–can be found in the brochure entitled Financing for Development at the World Bank Group.
eC2: CONSULTING SERVICES TO IDENTIFY FUTURE SMART GRID OPTIONS AND ROADMAP FOR TEIAS TRANSMISSION NETWORK
Deadline: 18-Apr-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) 
The shortlisting criteria are:
Experience in transmission network levels design, implementation, and/or operation relating to substation protection system, SCADA system, and/or status monitoring system in a central dispatching center. Primary nominal voltage shall be equal to or higher than 220kV.
Assessment of engagements in financial services for basic service delivery (solar, water and education)
Deadline: 18-Apr-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) 
The objective of the research is to assess the extent to which CGAPs efforts were successful in influencing and contributing to the development of early applications of digital payments for the delivery of services such as solar energy, education and water in developing countries. The assignment will consist of an in-depth review and assessment of the CGAPs influence in the off-grid solar energy sector, and a more limited assessment for the education and water industries. The research will include a mix of secondary and primary research.
Development Goals. Mobilizing the necessary resources remains central to its success.
You must be logged in to post a comment.