eConsultant2: Lighting Africa: Retail Channel Development in Nigeria

Deadline: 01-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

The Lighting Africa Nigeria Program now seeks to engage a Consulting firm starting April 2016 for a period of 12 months with the opportunity for follow-on work based on performance, to: solar-energy

1. Identify, pre-qualify and recruit potential retail channel members that will stock and retail solar products.

2. Assign a team of Retail Market Developers who will:

  • Work very closely with IFC Business Development Consultant to execute point 1 across the targeted regions in Nigeria, and develop a comprehensive database of retailers, sub-distributors and wholesalers and identify new market segments.
  • Work with the IFC Business Development Consultant to develop and undertake continuous monitoring of the channels and recommend any improvements to enhance their performance.

Continue reading

eConsultant2: Scaling Up Rural Sanitation Campaign in India

Deadline: 08-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

The objective of this assignment is to engage a firm to extend technical support to Jharkhand state in scaling up rural sanitation for a period of two years, with a provision to_DSC8237 extend services if required.

The Technical Service Unit (TSU) will provide technical assistance to SBM rural program, including strengthening institutional capacity in areas like knowledge management, behavioral change communication , action learning, solid and liquid waste management options, program delivery, monitoring and verification systems and any other areas of demand as expressed by the state. It will work closely with the nodal department of SBM in the state, coordinate with district level functionaries and other stakeholders in the state and build and maintain strong partnerships with existing World Bank projects and other development partners that work at scale.
Continue reading

eConsultant2:HONIARA FLOOD RISK MANAGEMENT STUDY AND PLAN

Deadline: 21-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)Berbera Corridor

Capturing LiDAR data and developing a Digital Elevation Model;
Preparing hydrologic and 1D/2D hydraulic flood models, calibrated to the April 2014 flood, and using these for design flood modelling and hazard mapping;
Assessing flood risks including to buildings, roads, critical infrastructure and life;

Continue reading

eConsultant2:Kenya Geothermal Strategy

Deadline: 02-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

The World Bank will hire a consultant firm to support MoEP in the preparation of the Krafla_geothermal_power_station_wikiGeothermal Strategy. The consultant responsibilities are expected to include:

a) Review of the adequacy of existing arrangements for geothermal development with particular focus on the following key areas: ………

b) Development of specific objectives on geothermal development, deliverable targets, and plans including actions that adequately address the challenges in (a) above.

c) Prepare the Geothermal Strategy document for MoEP, including implementation plan.

d) Present the results in a workshop of stakeholders, potentially including investors conference.

Continue reading

eConsultant2:Feasibility Design Review for a Phased Rehabilitation & Extension of Monrovias Sewerage System

Deadline: 02-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

This consultancy will have three main objectives:

(a) Update the information about the current piped sewerage system and treatment plant, waste water treamentas well as estimate the demand and willingness to pay for piped sewerage in Monrovia;

(b)Carry out an engineering assessment of the technical options and associated costs for a phased rehabilitation and extension of Monrovias piped sewerage system, and recommend an approach;

(c) For the recommended approach, prepare a detailed design and costing including draft safeguard and tender documentation;

Continue reading

eConsultant2:AIR AND WATER POLLUTION MANAGEMENT TECHNICAL ASSISTANCE PROGRAM

Deadline:03-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

In each of the key sectors which are the main contributors of air pollution in Grsolid wasteeater Cairo and water pollution in the Nile Delta, an analysis will be undertaken to determine the key abatement and policy measures to adhere to good practice international standards. The key sectors of analysis are: (i) waste; (ii) agriculture: (iii) sanitation: (iv) energy; (vi) transport; and (vii) industry.

 

Continue reading

eConsultant2:Assessment of the financial sustainability of the water supply and sanitation (WSS) sector in Haiti

Deadline: 08-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

In this context,the WB will hire a consulting Firm to develop:
1. An assessment of the financial sustainability of WSS service providers in urban areas and small towns;Waste water plant
2. A proposal for a set of ambitious but achievable goals to improve the financial performance of WSS service providers in the medium and long term, indicating and costing the required lines of action to support them in achieving said goals;
3. An assessment of the financial sustainability – in the medium and long term of the WSS sector institutional structure in place (both the central & deconcentrated level)

Continue reading

eConsultant2: Qualitative/Interview Data Collection for Sunaula Hazar Din Community Action for Nutrition Project in Nepal

Deadline: 01-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

The objective of this assignment is to collect high quality qualitative data on situations,Survey activities, and perceptions of SHD stakeholders, including participating community members and project staff including coaches (facilitators). The collected qualitative/interview data will be the foundation for a qualitative assessment to be conducted by the World Bank team which aims at further drawing lessons and implications for the on-going SHD project design and implementation.

Continue reading

eConsultant2:Odisha Hospitals Project: Hospital Planning and Design Consultant

Deadline:04-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

IFC will advise the Government of Odisha, India to roll out a network of betweeHospitaln 6-12 low cost hospitals across the state on a PPP basis.

These hospitals will be designed to provide modern and quality healthcare services at affordable rates for the next few decades in the state.

Continue reading

eConsultant2: TA for supporting Kenya’s devolution process

Deadline: 29-Feb-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

This consultancy will have three main objectives:

(a) to carry out an institutional review of how different counties are dealing with theSenegal-Woman-at-Well-800ir water utilities in providing water and sanitation services and provide some good practices from best performing counties and utilities, both nationally and internationally;
(b) to support Kiambu County to conceptualize and implement the clustering process; and
(c) develop material and organize forums to support knowledge exchange and peer-to-peer learning for counties nationally.

Continue reading