eConsultant2:Kenya Local Content Development Project

Deadline: 17-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

The WBG is hiring an individual consultant as a project coordinator and technical lead with experience Free-BRT-Bus-rides-in-LAgosin developing and managing SME capacity development and local content projects. This individual will manage the project from the start, setting up a public-private oversight committee, undertaking stakeholder outreach, as well as designing, running, and monitoring the projects technical work.
 

Continue reading

eConsultant2: Social impact assessment in Togo: road transport and logistics services sector reforms

Deadline:06-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)Survey

The assignment is to conduct a social impact assessment in Togo in order to estimate the cost and benefit of the proposed reforms in the road transport and logistics service sector in Togo, which will be undertaken as part of the forthcoming World Bank project.

Continue reading

eConsultant2:Capacity building training workshop on GLOBALG.A.P. for fruit and vegetables

Deadline: 09-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

IFC is procuring a Consulting Firm to organize and deliver one two-day capacity building Ethiopia agtraining workshop for up to 15 participants about the Standard of Good Agricultural Practice, GLOBALG.A.P. Version 5 for fruit and vegetables in Moldova. The workshop will cover GLOBALG.A.P. General regulations, All farm base, Farm management (soil, water and inputs), Documentation, and Staff Training modules and will be conducted with use of case studies to facilitate the learning. The content of the workshop should reflect the needs of local market participants, which have limited knowledge and experience in GLOBALG.A.P.
Continue reading

eConsultant2:HONIARA FLOOD RISK MANAGEMENT STUDY AND PLAN

Deadline: 21-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)Berbera Corridor

Capturing LiDAR data and developing a Digital Elevation Model;
Preparing hydrologic and 1D/2D hydraulic flood models, calibrated to the April 2014 flood, and using these for design flood modelling and hazard mapping;
Assessing flood risks including to buildings, roads, critical infrastructure and life;

Continue reading

eConsultant2:Kenya Geothermal Strategy

Deadline: 02-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

The World Bank will hire a consultant firm to support MoEP in the preparation of the Krafla_geothermal_power_station_wikiGeothermal Strategy. The consultant responsibilities are expected to include:

a) Review of the adequacy of existing arrangements for geothermal development with particular focus on the following key areas: ………

b) Development of specific objectives on geothermal development, deliverable targets, and plans including actions that adequately address the challenges in (a) above.

c) Prepare the Geothermal Strategy document for MoEP, including implementation plan.

d) Present the results in a workshop of stakeholders, potentially including investors conference.

Continue reading

eConsultant2:Feasibility Design Review for a Phased Rehabilitation & Extension of Monrovias Sewerage System

Deadline: 02-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

This consultancy will have three main objectives:

(a) Update the information about the current piped sewerage system and treatment plant, waste water treamentas well as estimate the demand and willingness to pay for piped sewerage in Monrovia;

(b)Carry out an engineering assessment of the technical options and associated costs for a phased rehabilitation and extension of Monrovias piped sewerage system, and recommend an approach;

(c) For the recommended approach, prepare a detailed design and costing including draft safeguard and tender documentation;

Continue reading

eConsultant2:AIR AND WATER POLLUTION MANAGEMENT TECHNICAL ASSISTANCE PROGRAM

Deadline:03-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

In each of the key sectors which are the main contributors of air pollution in Grsolid wasteeater Cairo and water pollution in the Nile Delta, an analysis will be undertaken to determine the key abatement and policy measures to adhere to good practice international standards. The key sectors of analysis are: (i) waste; (ii) agriculture: (iii) sanitation: (iv) energy; (vi) transport; and (vii) industry.

 

Continue reading

eConsultant2:Assessment of the financial sustainability of the water supply and sanitation (WSS) sector in Haiti

Deadline: 08-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

In this context,the WB will hire a consulting Firm to develop:
1. An assessment of the financial sustainability of WSS service providers in urban areas and small towns;Waste water plant
2. A proposal for a set of ambitious but achievable goals to improve the financial performance of WSS service providers in the medium and long term, indicating and costing the required lines of action to support them in achieving said goals;
3. An assessment of the financial sustainability – in the medium and long term of the WSS sector institutional structure in place (both the central & deconcentrated level)

Continue reading

eConsultant2:Odisha Hospitals Project: Hospital Planning and Design Consultant

Deadline:04-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

IFC will advise the Government of Odisha, India to roll out a network of betweeHospitaln 6-12 low cost hospitals across the state on a PPP basis.

These hospitals will be designed to provide modern and quality healthcare services at affordable rates for the next few decades in the state.

Continue reading

eConsultant2:Maputo and Antananarivo Household Survey

Deadline:29-Feb-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)Survey

The project will carry out a geo-referenced household survey in Greater Maputo and Antananarivo to gain some insights on the impact of and the trade-offs between location characteristics, welfare, risks, access to infrastructure and services, as well as land value.

Continue reading