Deadline: 21-Mar-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
Capturing LiDAR data and developing a Digital Elevation Model;
Preparing hydrologic and 1D/2D hydraulic flood models, calibrated to the April 2014 flood, and using these for design flood modelling and hazard mapping;
Assessing flood risks including to buildings, roads, critical infrastructure and life;
Geothermal Strategy. The consultant responsibilities are expected to include:
as well as estimate the demand and willingness to pay for piped sewerage in Monrovia;
eater Cairo and water pollution in the Nile Delta, an analysis will be undertaken to determine the key abatement and policy measures to adhere to good practice international standards. The key sectors of analysis are: (i) waste; (ii) agriculture: (iii) sanitation: (iv) energy; (vi) transport; and (vii) industry.
activities, and perceptions of SHD stakeholders, including participating community members and project staff including coaches (facilitators). The collected qualitative/interview data will be the foundation for a qualitative assessment to be conducted by the World Bank team which aims at further drawing lessons and implications for the on-going SHD project design and implementation.
n 6-12 low cost hospitals across the state on a PPP basis.
ir water utilities in providing water and sanitation services and provide some good practices from best performing counties and utilities, both nationally and internationally;
preparatory tools, documents and capacities. Improving Readiness for e-Procurement – one of the components under the Grant includes the activities to develop e-GP Strategy, carry out extensive Business Process Reengineering (BPR) of the Procurement Processes and practices, development of e-GP guidelines, and development of business, functional and technical specifications and bidding document for the implementation of e-GP System in Zimbabwe.
You must be logged in to post a comment.