eC2: Strategic Environmental and Social Impact Assessment for the Lake Victoria Transport Program

Deadline: 22-Aug-2017 at 11:59:59 PM (Eastern Time – Washington D.C.)

The proposed program of interventions on and around Lake Victoria are expected to Image result for lake victoriacontribute to improve transport connectivity and sustainability. Whilst local impacts are identified and addressed in site specific ESIA, the lake ecosystem is large, complex, multi-dimensional and dynamic. Understanding the social and environmental issues thus requires comprehensive observation and management at the catchment scale in a holistic manner. Given the wider scope of the interventions on the Lake Victoria basin (both at the ports, but also with the lake itself), with knock-on or cumulative effects on the lakes overall catchment area, a strategic planning framework for the development and protection of the lake, its dependents, and associated infrastructure is critically important. This assignment is designed to support the LVBC do that.
Continue reading

eC2: Feasibility study for dredging options at Lake Victoria ports under varying lake levels

Deadline: 24-Jul-2017 at 11:59:59 PM (Eastern Time – Washington D.C.)

The overall objective of the assignment is to identify the most economic, climate resilientd8423-lake-toba2bview and environmentally sustainable dredging levels for key ports and shipping routes on Lake Victoria. Improving transportation on Lake Victoria is key to strengthening the Tanzanian Central Corridor, and is a priority for the Governments of Tanzania, Uganda and Kenya. The lake plays a pivotal role in connecting land-locked countries (DRC, Uganda, Rwanda and Burundi) via its shipping and railway network and is a key part of the intermodal supply chains along the Northern and Central corridor linking to Mombasa and Dar es Salaam ports. However, in recent years port infrastructure and consequently maritime operations on Lake Victoria have declined significantly.
Continue reading