eC2: Feasibility study for dredging options at Lake Victoria ports under varying lake levels

Deadline: 24-Jul-2017 at 11:59:59 PM (Eastern Time – Washington D.C.)

The overall objective of the assignment is to identify the most economic, climate resilientd8423-lake-toba2bview and environmentally sustainable dredging levels for key ports and shipping routes on Lake Victoria. Improving transportation on Lake Victoria is key to strengthening the Tanzanian Central Corridor, and is a priority for the Governments of Tanzania, Uganda and Kenya. The lake plays a pivotal role in connecting land-locked countries (DRC, Uganda, Rwanda and Burundi) via its shipping and railway network and is a key part of the intermodal supply chains along the Northern and Central corridor linking to Mombasa and Dar es Salaam ports. However, in recent years port infrastructure and consequently maritime operations on Lake Victoria have declined significantly.

See full tender here: Feasibility study for dredging options at Lake Victoria ports under varying lake levels

eConsultant2 website: https://wbgeconsult2.worldbank.org

Tender notification: # 1245698

Assignment Countries:

  • TZ – Tanzania
  • UG – Uganda
  • KE – Kenya

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s