eC2: Development of national approaches for assessment of hydromorphological status of Surface Water Bodies and of national methodology for identification and designation of Heavily Modified Water Bodies

Deadline: 12-Nov-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)RotterdamWaterPlein_klein

The assignment aims at filling the encountered gaps in terms of methodical base, qualitative and quantitative data for hydromorphological quality elements (HMQE), required for the assessment of the ecological status of surface water bodies (SWBs) and potential of Heavily Modified Water Bodies (HMWB) and Artificial Water Bodies (AWBs), in compliance with the WFD and most recent good practices and CIS guidance documents. The procedures are mandatory for achieving the objectives of Directive 2000/60/EC and the obligations of Bulgaria as a MS with respect to the EU water policy. The results have to provide the missing and further develop the existing methodical basis, which should regulate and guide the identification and designation of HMWBs & AWBs, the execution of further field works and monitoring programs, the interpretation of the results for HMQEs and the following assessment of the hydromorphological status of SWBs of category rivers, lakes and transitional waters as supporting the overall ecological status assessment.

Continue reading

eC2: Agricultural Technology Solutions for IFC Clients in Vietnam

Deadline: 07-Nov-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

As part of its efforts to build its leadership in providing access to Ag tech solutions to smallholder farmers that help improve their overall agricultural production practices and sustainability, the Ag Tech Vietnam project aims to: 1) develop and apply ag tech innovations in up to 3 crops in Vietnam to inform precise farming response resulting in reduced input use and costs; and 2) roll out a commercially viable model for at least 1,200 smallholder farmers usage of Ag Tech services and achieve scale.

Continue reading

eC2: Creating Market Opportunities for Women Small and Medium Enterprises in Bangladesh- Corporate Engagement and Networking

Deadline: 04-Nov-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) woman

The objective of the assignment is to initiate the corporate engagement and awareness strategy through facilitating a high level conference to bringing together support organizations, WSMEs, Corporations, financial institutes and policy makers to created awareness and facilitate market opportunities.

Continue reading

eC2: Technical Assistance in Assessment of Extreme Weather and Climatic Risks in the Federated States of Micronesia and Republic of the Marshall Islands

Deadline: 07-Nov-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)vn-communitybased-disasterrisk-780x439

The objective of the assignment is to initiate the corporate engagement and awareness strategy through facilitating a high level conference to bringing together support organizations, WSMEs, Corporations, financial institutes and policy makers to created awareness and facilitate market opportunities.

Continue reading

eC2: Trade Facilitation West Africa Communications and Awareness

Deadline: 11-Nov-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) trade-lpi-2018-warehouse-shutterstock

Develop an informed, regionally effective communications strategy and tactical plan (in writing) by: Researching and mapping which tactics are the most suitable for the market/region/audience. Organizing and facilitating meetings and/or workshops between TFWA Program communications focal points and representatives of various institutions with an interest in the regions trade facilitation agenda to inform its approach. Ensuring the strategy and plan incorporate priorities of the various TFWA Program stakeholders while also ensuring consistency with TFWA Program objectives, targets, and communications guidelines and graphic standards. Seek approval for the above strategy and plan and rework the approach as needed.
Execute the approved tactics to Bank-level standards.
Provide ECOWAS/UEMOA with the tools required to take over and implement the communications plan in the long term.
Produce progress reports at agreed intervals (per each task order).

Continue reading

eC2: Acceleration Services for AG Tech Project in Vietnam

Deadline: 29-Oct-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)scaling-up-innovations-in-agriculture-lessons-from-africa-780x439

As part of its efforts to build its leadership in providing access to ag tech solutions to smallholder farmers that help improve their overall agricultural production practices and sustainability, IFCs Ag Tech Vietnam project aims to: 1) develop and apply ag tech innovations in up to 3 crops in Vietnam to inform precise farming response resulting in reduced input use and costs; and 2) roll out a commercially viable model for smallholder farmers usage of Ag Tech services and achieve scale.

Continue reading

eC2: Chemical status assessment methodology reflecting the impacts of the climate changes on the status of surface water including analysis of chemical pressure, impacts, risks and status

Deadline: 31-Oct-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

water_quality_mason_jar

The assignment envisages five main activities as follows: Activity 1. Pressure and impact analysis taking into account new priority pollutants included in Directive 2013/39/EC and new industrial activities. Activity 2. Chemical Status assessment methodology Activity 3: Training of experts from River Basin Directorates (RBDs) on the application of developed methodology for chemical status assessment. Activity 4. Assessment of chemical status of water bodies in the country based on defined background concentrations, refined methodologies for chemical status assessment and available results. Activity 5. Proposal for new monitoring programs including new monitoring points and pollutants for measurement. Critical evaluation of concentration of pollutants that has never been introduced in the country and never measured above EQS and proposal for their elimination from monitoring programs.

Continue reading

eC2: Consultancy Services for Water Supply and Sanitation (WSS) Policy, Institutions, and Regulation Assessments

Deadline: 30-Oct-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) water

The scope of the consultancy services shall include but not be limited to the following:
i. Analyze the role of PIR in achieving better water and sanitation outcomes e.g. in terms of access, quality of services, resilience, inclusion, efficiency and sustainability to name just a few. The challenges and opportunities for doing so will be highly country-specific and the objective of this work is to anchor the diagnostic and reform proposals in those local contexts. The diagnostic should also develop evidence on how PIR is supporting or undermining progress in desired WSS outcomes. ii. Prepare an action plan for addressing the challenges identified in the diagnostic. Propose a menu of activities for each country that directly address the PIR weaknesses and leverages reform opportunities.  iii. Develop key messages and communication products based on the country assessments: Draw out key messages, lessons, and insights that could be relevant for a global PIR agenda. Develop presentations, blogs and briefs and other communication materials to disseminate findings and advocate for more attention on PIR at national and international fora.

Continue reading

World Bank Live Events Oct. 18/19

Watch the events below live

October 18, 2019

October 18, 2019 | 9:00 ET, 13:00 GMT

2019 Annual Meetings Plenary

October 18, 2019 | 11:00 ET, 15:00 GMT

Jobs and Economic Transformation

 

 

October 19, 2019

 

 

eC2: Consultancy Services for Water Supply and Sanitation (WSS) Policy, Institutions, and Regulation Assessments

Deadline: 30-Oct-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

water_quality_mason_jar

The scope of the consultancy services shall include but not be limited to the following:
i. Analyze the role of PIR in achieving better water and sanitation outcomes e.g. in terms of access, quality of services, resilience, inclusion, efficiency and sustainability to name just a few. The challenges and opportunities for doing so will be highly country-specific and the objective of this work is to anchor the diagnostic and reform proposals in those local contexts. The diagnostic should also develop evidence on how PIR is supporting or undermining progress in desired WSS outcomes. ii. Prepare an action plan for addressing the challenges identified in the diagnostic. Propose a menu of activities for each country that directly address the PIR weaknesses and leverages reform opportunities. iii. Develop key messages and communication products based on the country assessments: Draw out key messages, lessons, and insights that could be relevant for a global PIR agenda. Develop presentations, blogs and briefs and other communication materials to disseminate findings and advocate for more attention on PIR at national and international fora.

Continue reading