Deadline: 09-May-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
This is an assignment to conduct a post program evaluation for the investment climate reform projects financed by SECO in Africa. Continue reading
Deadline: 09-May-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
This is an assignment to conduct a post program evaluation for the investment climate reform projects financed by SECO in Africa. Continue reading
Deadline:20-May-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
The World Bank is in the initial stages of working with Vietnams Ministry of Agriculture
and Rural Development for the identification of preparedness and risk reduction measures for coastal hazards. This assignment can be seen as a first step in establishing an overview. Later on, activities to come to design guidelines, feasibility studies and possibilities for Public Private Partnerships are foreseen
Deadline: 11-May-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
This consultancy has three main objectives: (a) Update the information about the current
piped sewerage system and treatment plant of Monrovia (Liberia), in particular carry out a customer enumeration, compile a map of the existing system as well as estimate the demand and willingness to pay for piped sewerage; (b) Assess the technical options and associated costs for a rehabilitation of Monrovias piped sewerage system, and its phased extension to priority areas, recommending a technical solution;(c) For the recommended approach, prepare a detailed design and costing, including draft safeguard and tender documents, for Phase 1 i.e. the rehabilitation of the existing system and important minor extensions up to a budget of US$ 20m.
Deadline:14-May-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
The Firm will be hired to do a landscape analysis of private investors, both global and local,
who are already active in the health and/or RMNCAH space in developing countries, and identify possible opportunities to leverage GFF and partner resources and financing instruments to encourage more pro-poor, bottom of the pyramid investments to maximize health impact. Private sector for the purposes of this analysis will include investments into both for-profit and not-for profits (including NGOs).
Deadline: 05-May-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
IFC is working with KTDA to carry out soil and leaf testing across the 67 factories. The project will collect a statistically valid set of soil and leaf samples from each major soil type. Analysis of these samples will identify macro and micro soil nutrient deficiencies, which will be addressed through the development of improved fertilizer blends and application recommendations.
Deadline: 03-May-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
The Consultants will prepare a feasibility study consistent with the PPP Act (2013), to a standard that will enable the County Government of Nakuru to establish the technical configuration, commercial attractiveness and bankability of the proposed Project. The overall objective of the consultancy assignment is to assist the County Government in developing a bankable transaction structure for the proposed project under a PPP scheme.
Deadline: 03-May-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
The Consultants will prepare a feasibility study consistent with the PPP Act (2013), to a standard that will enable the County Government of Muranga to establish the technical configuration, commercial attractiveness and bankability of the proposed Project.
The overall objective of the consultancy assignment is to assist the County Government in developing a bankable transaction structure for the proposed project under a PPP scheme.
Deadline: 01-May-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
The Equity Analysis of Piped Water Delivery in Urban Mozambique (P156563) study have
the following objectives:
i. Identify the urban poor, their level of and trends in access to improved water supply services, and conditions of access to services.
ii. Undertake a thorough review of access constraints to water supply by the poor.
iii. Model the investment requirements for rehabilitation and expansion of water supply services, and impacts on operational and maintenance costs.
iv. Based on (i), (ii), and (iii), understand potential mechanisms to address access constraints to inform policy, regulation, and utilities action plan to secure access to improved water by the poor.
Deadline: 30-Apr-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
The objectives of the competition assessment of the post-production distribution chain
(including acquisition, warehousing, transportation and export segments) of wheat and sunflower seed are to: (i) assess the competition status and identify key barriers to competition in these segments of the chain; (ii) assess the impact of barriers to competition on farmers and private sector investments; (iii) propose remedy solutions to the Competition Council and the Government of Moldova.
Deadline: 30-Apr-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
The objectives of the regulatory assessment of agricultural input markets comprising of seeds and seedlings, fertilizers and pesticides, as well as agricultural machinery and equipment.
You must be logged in to post a comment.