eConsultant2: Design Review for a Phased Rehabilitation & Extension of Monrovias Sewerage System

Deadline: 11-May-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)

This consultancy has three main objectives: (a) Update the information about the current waterpiped sewerage system and treatment plant of Monrovia (Liberia), in particular carry out a customer enumeration, compile a map of the existing system as well as estimate the demand and willingness to pay for piped sewerage; (b) Assess the technical options and associated costs for a rehabilitation of Monrovias piped sewerage system, and its phased extension to priority areas, recommending a technical solution;(c) For the recommended approach, prepare a detailed design and costing, including draft safeguard and tender documents, for Phase 1 i.e. the rehabilitation of the existing system and important minor extensions up to a budget of US$ 20m.

See full tender here:Design Review for a Phased Rehabilitation & Extension of Monrovias Sewerage System

eConsultant2 website: https://wbgeconsult2.worldbank.org

Tender notification:# 1218028

Assignment Countries:

  • LR – Liberia

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s