Unknown's avatar

About NL4WorldBank

The World Bank Team at the Royal Netherlands Embassy tweets about news related to Dutch organizations interested in working with the #WorldBank. #NL4WorldBank

Study tour to the Netherlands offers new insights on nature-based solutions

Last week, government officials and specialists from Albania, Georgia, Ghana, Liberia groepWB_1and Romania came to the Netherlands for a World Bank study tour on nature-based solutions organized by the Netherlands Water Partnership. One of the participants was Ivane Vashakmadze, Tourism Expert and World Bank Consultant from Georgia. In his blog, he shares his experiences and his lessons learnt on nature-based solutions.

eC2: Chemical status assessment methodology reflecting the impacts of the climate changes on the status of surface water including analysis of chemical pressure, impacts, risks and status

Deadline: 31-Oct-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

water_quality_mason_jar

The assignment envisages five main activities as follows: Activity 1. Pressure and impact analysis taking into account new priority pollutants included in Directive 2013/39/EC and new industrial activities. Activity 2. Chemical Status assessment methodology Activity 3: Training of experts from River Basin Directorates (RBDs) on the application of developed methodology for chemical status assessment. Activity 4. Assessment of chemical status of water bodies in the country based on defined background concentrations, refined methodologies for chemical status assessment and available results. Activity 5. Proposal for new monitoring programs including new monitoring points and pollutants for measurement. Critical evaluation of concentration of pollutants that has never been introduced in the country and never measured above EQS and proposal for their elimination from monitoring programs.

Continue reading

eC2: Consultancy Services for Water Supply and Sanitation (WSS) Policy, Institutions, and Regulation Assessments

Deadline: 30-Oct-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) water

The scope of the consultancy services shall include but not be limited to the following:
i. Analyze the role of PIR in achieving better water and sanitation outcomes e.g. in terms of access, quality of services, resilience, inclusion, efficiency and sustainability to name just a few. The challenges and opportunities for doing so will be highly country-specific and the objective of this work is to anchor the diagnostic and reform proposals in those local contexts. The diagnostic should also develop evidence on how PIR is supporting or undermining progress in desired WSS outcomes. ii. Prepare an action plan for addressing the challenges identified in the diagnostic. Propose a menu of activities for each country that directly address the PIR weaknesses and leverages reform opportunities.  iii. Develop key messages and communication products based on the country assessments: Draw out key messages, lessons, and insights that could be relevant for a global PIR agenda. Develop presentations, blogs and briefs and other communication materials to disseminate findings and advocate for more attention on PIR at national and international fora.

Continue reading

World Bank Live Events Oct. 18/19

Watch the events below live

October 18, 2019

October 18, 2019 | 9:00 ET, 13:00 GMT

2019 Annual Meetings Plenary

October 18, 2019 | 11:00 ET, 15:00 GMT

Jobs and Economic Transformation

 

 

October 19, 2019

 

 

eC2: Consultancy Services for Water Supply and Sanitation (WSS) Policy, Institutions, and Regulation Assessments

Deadline: 30-Oct-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

water_quality_mason_jar

The scope of the consultancy services shall include but not be limited to the following:
i. Analyze the role of PIR in achieving better water and sanitation outcomes e.g. in terms of access, quality of services, resilience, inclusion, efficiency and sustainability to name just a few. The challenges and opportunities for doing so will be highly country-specific and the objective of this work is to anchor the diagnostic and reform proposals in those local contexts. The diagnostic should also develop evidence on how PIR is supporting or undermining progress in desired WSS outcomes. ii. Prepare an action plan for addressing the challenges identified in the diagnostic. Propose a menu of activities for each country that directly address the PIR weaknesses and leverages reform opportunities. iii. Develop key messages and communication products based on the country assessments: Draw out key messages, lessons, and insights that could be relevant for a global PIR agenda. Develop presentations, blogs and briefs and other communication materials to disseminate findings and advocate for more attention on PIR at national and international fora.

Continue reading

eC2: Flood and Coastal Risk Assessment and Priority Investment Planning for Greater Banjul

Deadline: 30-Oct-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)

westafrica_coastalerosion_780x520

Specific objectives of this assignment will be to:
(1) Undertake data collection, building on existing baseline data and information, to describe the physical and build environment of Greater Banjul;
(2) Analyze and assess the flood and coastal risks for the Greater Banjul area and identify areas most at risk (hotspots); and
(3) Undertake a participatory investment planning process to identify priority areas of intervention that support urban resilience

Continue reading

Building strong, inclusive economies and achieving successful country outcomes together at the 2019 Annual Meetings

Nearly 1.1 billion people escaped extreme poverty between 1990 and 2015, thanks to kick-off-blog-2broad-based economic growth and inclusive approaches to development. But progress is stalling, and we face an urgent challenge; today, one in 10 people still live in extreme poverty.

ANNUAL MEETINGS 2019

World Bank Live 2019

Continue reading

eC2: Kosovo Solar Technical, Environmental and Social Consultant

Deadline: 28-Oct-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)solar-wind (CC0) Pixabay-Kenueone

IFC has been retained as lead transaction advisor by the Government of Kosovo to procure the development, construction and operation and maintenance of 50 MW of utility-scale solar PV power on a PPP basis (the Project). As such, IFC is procuring a technical, environmental and social consulting firm (or consortium) to advise on the Project. The assignment will be split in to several phases and is expected to include: initial assessment of the potential site; review of grid code and development of the PPA technical limits schedule; detailed site studies, including ground investigations, grid integration studies and E&S scoping; and support to the tender process (e.g. tailoring of technical specs, prequalification evaluation, bid evaluation). The Project may also include an element of battery storage. Engineering firms should consider partnering with E&S firms to strengthen their E&S offering. Use of local partners for ground investigations and local E&S expertise is also recommended.

Continue reading

eC2: Development of Combined Energy Efficiency and Productivity Assessment Tool for Garment Factories

Deadline: 24-Oct-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)Readymade-Garments-Industry-of-Bangladesh

The objective of this assignment is to develop a Combined Energy Efficiency and Productivity Assessment Tool for garment factories in emerging markets to help companies identify where they are positioned on all key dimensions of overall productivity, as compared vis- vis-à-vis best in class and define progression milestones from the starting position to best in class.

Continue reading

World Development Report 2020