Deadline: 28-Nov-2017 at 11:59:59 PM (Eastern Time – Washington D.C.)
Objective: The consulting firm should develop six outlines of business cases for six different PPP projects in Central America. Preparation of Pre-feasibility study review shall consist of the following topics: a. Legal and institutional review; b. Technical review; c. Economic and commercial review; d. Social and environmental assessment; e. Review on types of PPP in infrastructure provision; f. Risks review; g. Review on the need of Government Support and/or Guarantee; and h. Review on outstanding issues that need to be solved.





without the one item you set out for? Conversely, have you ever wandered into a much smaller “mom and pop” shop and found everything you need?
world but this is usually done in an ad-hoc basis and is not part of a long-term national strategy or policy. There are successes and failures around the world and information on the technological options abound, but there is much less information available on the institutional, regulatory and policy frameworks that incentivize these schemes nor on the financing/contractual arrangements behind these approaches. Many developing countries still think of wastewater as a waste; as something that needs to be treated and discharged. There is a need to move from a linear to a circular thinking.
You must be logged in to post a comment.