eC2: Hydraulic study and Environmental Flows (EFlows) Assessment for the Mpatamanga Hydropower Project

HYDRODeadline: 22-Mar-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)

Objective:  IFC is supporting the Government of Malawi (GOM) with the development of the 309 MW Mpatamanga Hydroelectric Project. IFC is proposing to procure a consultant to provide certain services in this regard. The main objective of the services is to confirm the adequacy of the proposed operation pattern for the Mpatamanga HPP. The study is aimed at 1) confirming / identifying acceptable minimum and maximum flow for the daily peaking operations and 2) better defining the extent and impacts of the water level and flow velocity daily fluctuations, especially on important natural ecosystems downstream.

Continue reading

eC2:Institutional Feasibility Study for the Management of Irrigation Schemes’ Hydraulic Systems

Deadline: 31-Oct-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)water

For Step 1: The study will cover all existing public Irrigation Schemes of Tunisia
For Steps 2, 3, and 4 (intervention zone of the World Bank-funded project): The study will cover the irrigation schemes of Northern Tunisia located in the Governorates of Siliana, Jendouba, Béja, and Bizerte. The Irrigation Schemes planned under the 2016-2020 development plan will be considered for the forecasting of the business development of the entity in charge of the selected management arrangements in the Governorates covered by the project. The study area includes the Public Irrigation Schemes benefiting from the “Irrigated Agriculture Intensification Project” proposed for funding to the World Bank and located in the Governorates mentioned above.

Continue reading