eC2: Hydraulic study and Environmental Flows (EFlows) Assessment for the Mpatamanga Hydropower Project

HYDRODeadline: 22-Mar-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)

Objective:  IFC is supporting the Government of Malawi (GOM) with the development of the 309 MW Mpatamanga Hydroelectric Project. IFC is proposing to procure a consultant to provide certain services in this regard. The main objective of the services is to confirm the adequacy of the proposed operation pattern for the Mpatamanga HPP. The study is aimed at 1) confirming / identifying acceptable minimum and maximum flow for the daily peaking operations and 2) better defining the extent and impacts of the water level and flow velocity daily fluctuations, especially on important natural ecosystems downstream.

See full tender here: Hydraulic study and Environmental Flows (EFlows) Assessment for the Mpatamanga Hydropower Project – Malawi

EConsultant2 website: https://wbgeconsult2.worldbank.org/wbgec/index.html

Tender notification:  # 1255388

Assignment Countries:

  • MW – Malawi

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s