Deadline: 31-Oct-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)
For Step 1: The study will cover all existing public Irrigation Schemes of Tunisia
For Steps 2, 3, and 4 (intervention zone of the World Bank-funded project): The study will cover the irrigation schemes of Northern Tunisia located in the Governorates of Siliana, Jendouba, Béja, and Bizerte. The Irrigation Schemes planned under the 2016-2020 development plan will be considered for the forecasting of the business development of the entity in charge of the selected management arrangements in the Governorates covered by the project. The study area includes the Public Irrigation Schemes benefiting from the “Irrigated Agriculture Intensification Project” proposed for funding to the World Bank and located in the Governorates mentioned above.
See full tender here: institutional-feasibility-study-for-the-management-of-irrigation-schemes-hydraulic-systems
eConsultant2 website: https://wbgeconsult2.worldbank.org
Tender notification: # 1230494
Assignment Countries:
- TN – Tunisia
You must be logged in to post a comment.