eC2:  Capacity building on non-revenue water reduction and control, including through performance-based contracts, for the water and sewerage

Deadline: 10-Sep-2020 at 11:59:59 PM (Eastern Time – Washington D.C.)img_2137

The activity consists in capacity building on non-revenue water (NRW) reduction and control, including through performance-based contracts (PBCs), of the water and sewerage utility of the State of Pernambuco, Brazil (Compesa), and is part of the “Recife Smart Urban Water Management” Program, aiming to support the modernization of water supply and sanitation service delivery in the Recife Metropolitan Region (RMR), through the piloting of innovative smart water approaches. The specific objective of this activity is to develop and deliver a training program on NRW reduction and PBCs, comprising four modules, as well as both a distance learning and an in person components. In addition, the Firm will deliver a NRW reduction and PBC toolkit as a reference and guide for Compesa.

Continue reading →

eC2: Water Innovation Platform

Deadline: 10-Sep-2020 at 11:59:59 PM (Eastern Time – Washington D.C.) water

The World Bank (WB) will facilitate one-day virtual events to showcase technologies available on the market to client organizations local governments, utilities, and other service providers in each of two (2) selected regions, which will be identified based on initial client and WB Water Global Practice regional unit demand.
See Full tender link below to see the TOR

Continue reading →

eC2: Consultancy for a Water Resources Management Specialist

Deadline: 07-Sep-2020 at 11:59:59 PM (Eastern Time – Washington D.C.)water

Support the WRM GSG across its different streams of work: conduct portfolio analyses; maintain WR GSG website; conduct periodic searches in international community on new advances; draft blogs; support learning events; support implementation of water platforms ASAs; distill lessons learnt, among other tasks

Continue reading →

eC2: Support for articulating the Blue Economy and coastal adaptation investment priorities for Seychelles climate resilience

Deadline: 07-Sep-2020 at 11:59:59 PM (Eastern Time – Washington D.C.)blue_recovery_world_bank_environment

This consultancy is aimed at supporting the revision of the Seychelles NDC with a specific focus on Blue Economy. The consultant will be expected to 1) draft sections of the NDC to incorporate the various aspects of Blue Economy in the adaption and mitigation section and for various sectors, and 2) contribute to draft the National Adaptation plan outlining clear priorities for investment from the Blue Economy and coastal adaptation perspective, essential to achieve climate resilience in the Seychelles.

Continue reading →

eC2: Baseline Assessment for Plastic Debris flowing into Rivers and Seas of South Asia

Deadline: 01-Sep-2020 at 11:59:59 PM (Eastern Time – Washington D.C.)

westafrica_coastalerosion_780x520

The primary objective of this Consultancy is to take stock of baseline information for plastic waste leakage into rivers and seas to build a more harmonized regional monitoring, management, and policy framework for plastic waste reduction and enable a more circular economy model for plastics in the South Asia Region. The proposed assignment will document the current status of plastic pollution and its value chain (e.g. hotspots for marine plastic debris, waste composition, material flow of waste plastics), regulatory gap analysis, and identification of relevant stakeholders involved in the life-cycle of plastic and their needs, and possible recycling technology and innovations, etc.

Continue reading →

eC2: Preparation of Flood Hazard and Flood Risk Maps (FHRM) and Flood Risk Management Plans (FRMP)

Deadline: 31-Aug-2020 at 11:59:59 PM (Eastern Time – Washington D.C.)floods

The assignment aims to develop flood hazard and flood risk maps (FHRM) and flood risk management plans (FRMP) for all twelve Units of Management of Romania, i.e. for 11 river basins and for the Danube River, in line with the EU Floods Directive. Furthermore, the assignment also aims to develop a plan for measures that are to be taken nationally.

Continue reading →

eC2: Guyana- Improving Urban Resilience of Coastal Cities in the Caribbean through Resilient Infrastructure and Urban Planning

Deadline: 31-Aug-2020 at 11:59:59 PM (Eastern Time – Washington D.C.) blog-in-benin-can-resilient-investment-solutions-save-a-battered-coast-780x439

The consultancy primary objective is to provide professional expertise to develop a comprehensive urban resilience plan for the select coastal cities in Guyana, which aims to,
1.Study approaches for improving urban infrastructure planning to achieve resilience goals in coastal cities for the sustainable concurrence of the urban space with natural environment;
2.Help urban practitioners better understand the integration of green with existing grey infrastructure and contextually inform citiesplanning strategies; and
3.Forge an urban vision to identify infrastructure need and investment opportunities for the cities in the selected coastal areas.
Scope of Work
As part of the EU-GFDRR/WB Regional Resilience Program for LAC, the project will focus on carrying out diagnostic work related to urban resilience in selected coastal cities in Guyana. The main objective is to develop an integrated vision for building resilience and sustainability into infrastructure.

Continue reading →

eC2: Grenada – Improving Urban Resilience of Coastal Cities in the Caribbean through Resilient Infrastructure and Urban Planning

Deadline: 31-Aug-2020 at 11:59:59 PM (Eastern Time – Washington D.C.) water-pollution-cartoon

The consultancy objective is to provide professional expertise to develop a comprehensive urban resilience plan for the select coastal cities in Grenada which aims to,
1.Study approaches for improving urban infrastructure planning to achieve resilience goals in coastal cities for the sustainable concurrence of the urban space with natural environment;
2.Help urban practitioners better understand the integration of green with existing grey infrastructure and contextually inform cities planning strategies; and
3.Forge an urban vision to identify infrastructure need and investment opportunities for the cities in the selected coastal areas.
Scope of Work
As part of the EU-GFDRR/WB Regional Resilience Program for LAC, the project will focus on carrying out diagnostic work related to urban resilience in selected coastal cities for Grenada. The main objective is to develop an integrated vision for building resilience and sustainability into infrastructure.

Continue reading →

eC2: DRC Resilience Program Impact Evaluation Baseline

Deadline: 17-Aug-2020 at 11:59:59 PM (Eastern Time – Washington D.C.)Survey

DIME is hiring a survey firm with experience in collecting impact evaluation survey data in Eastern DRC. The selected firm will be responsible for implementing an Impact Evaluation baseline survey in the North and South Kivu provinces of the country. The survey firm will be traveling to an estimated 100 villages and will be collecting data across approximately 1500 households, including data on their demographics, economic and social characteristics, food security, and other resilience related outcomes. The survey is expected to start in September 2020 provided COVID-19 guidelines are respected.

Continue reading →

eC2: Technical Assistance towards strengthening supply chain management of health products and technologies in selected counties

Deadline: 20-Aug-2020 at 11:59:59 PM (Eastern Time – Washington D.C.)medical-appointment-doctor-healthcare-clinic-health-hospital-medicine[7]

The Reproductive Maternal Newborn Child and Adolescent Health (RMNCAH) Multi-Donor trust fund (MDTF) aims to enhance effectiveness in achieving sustainable RMNCAH results by strengthening the health systems and support progress towards universal health coverage. The overall objective of the MDTF supply chain management Technical Assistance for Health Products and Technologies (HPTs) is to build/strengthen HPT supply chain systems, with an emphasis on RMNCAH commodities, into efficient, effective, responsive and sustainable systems through the provision of targeted technical assistance and mentorship in 12 counties

Continue reading →