Deadline: 31-Aug-2020 at 11:59:59 PM (Eastern Time – Washington D.C.)
The assignment aims to develop flood hazard and flood risk maps (FHRM) and flood risk management plans (FRMP) for all twelve Units of Management of Romania, i.e. for 11 river basins and for the Danube River, in line with the EU Floods Directive. Furthermore, the assignment also aims to develop a plan for measures that are to be taken nationally.
You must be logged in to post a comment.