eC2:BELIZE ENERGY RESILIENT CLIMATE ADAPTATION PROJECT Loan

Deadline: 14-Sep-2017 at 11:59:59 PM (Eastern Time – Washington D.C.) India Energy

The objective of this assignment (the Services) is to assist Belize Electricity Limited (BEL) to develop an effective vegetation study and management plan. This is to ensure that the utility is able to better manage vegetation growth near and under its utilitys lines, and prevent any physically damaging incident with minimal losses, in particular during storms. The plan has to be implemented in an environmentally and socially sustainable manner and be in full compliance with Belizes and the World Banks environmental and social policies and regulations. The specific objectives are: (i) to assess the limitations and capacities of BEL personnel and physical inventory, whether positive or negative, and propose mitigation measures which will effectively address the response time; (ii) identify different alternatives and their potential impacts and relevant mitigation measures; and (iii) to establish clear directives and methodologies for the effective implementation of the plan. The indicative implementation period for the Services is September 2017 August 2019.

Continue reading

eC2: CONSULTANCY:TECHNICAL ASSISTANCE FOR THE PREPARATION OF AN EMERGENCY RESPONSE STUDY

Deadline: 10-Apr-2017 at 11:59:59 PM (Eastern Time – Washington D.C.) index

The objective of this assignment (the Services) is to assist the Belize Electricity Limited (BEL) to develop a comprehensive storm emergency preparedness and recovery/restoration plan for BEL, and the necessary institutional procedures and protocols for its effective implementation. This is to ensure that the utility is able to recover from any physically damaging incident with minimal time and losses. The plan has to be implemented in an environmentally and socially sustainable manner and be in full compliance with Belizes and the World Banks environmental and social policies and regulations. The specific objectives are: (i) to assess the limitations and capacities of BEL personnel and physical inventory, whether positive or negative, and propose mitigation measures which will effectively address the response time; (ii) identify different alternatives and their potential impacts and relevant mitigation measures; and (iii) to establish clear directives and methodologies for the effective implementation of the plan. The indicative implementation period for the Services is April 2017 August 2018.

Continue reading

eC2: CONSULTANCY – TECHNICAL ASSISTANCE FOR THE PREPARATION OF A VEGETATION STUDY

Deadline: 10-Apr-2017 at 11:59:59 PM (Eastern Time – Washington D.C.)index

The objective of this assignment (the Services) is to assist the Belize Electricity Limited (BEL) to develop an effective vegetation study and management plan. This is to ensure that the utility is able to better manage vegetation growth near and under its utilitys lines, and prevent any physically damaging incident with minimal losses, in particular during storms. The plan has to be implemented in an environmentally and socially sustainable manner and be in full compliance with Belizes and the World Banks environmental and social policies and regulations. The specific objectives are: (i) to assess the limitations and capacities of BEL personnel and physical inventory, whether positive or negative, and propose mitigation measures which will effectively address the response time; (ii) identify different alternatives and their potential impacts and relevant mitigation measures; and (iii) to establish clear directives and methodologies for the effective implementation of the plan. The indicative implementation period for the Services is April 2017 March 2019.

Continue reading

IADB Tender: Support for Improving Disaster and Climate Resilience in Sustainable Tourism

Deadline: Jun 03, 2016 06:00 PM (US Eastern Time)

The Inter-American Development Bank now invites eligible consulting firms to indicate their interest in providing the services. idb

The firm will: (i) design and carry out baseline coastal studies for Corozal District, (ii) prioritize the coastal area for shoreline stabilization measures, including where appropriate ecosystem-based coastal protection, non-structural and soft-engineering measures, and based upon agreed criteria and stakeholder engagement; (iii) prepare designs for shoreline stabilization investments; and (iv) conduct the feasibility analysis of investments in accordance with the requirements of the Bank for public sector financing, including socioeconomic, environmental, financial, and institutional feasibility. The consultancy will also provide support to training and dissemination activities. Award of this contract is pending final availability of resources. The procurement method for this contract will be quality and cost-based selection. The anticipated budget for the services is USD $700,000.

Continue reading