eC2: AGRO-EXTENSION SERVICES TO SMALLHOLDERS IN UGANDA

Deadline:  22-Sep-2020 at 11:59:59 PM (Eastern Time – Washington D.C.) Djibouti-farmers

The International Finance Corporation is seeking to contract a Firm to provide extension services to smallholder families. This assignment requires a firm with an already existing Agri-Tech digital platform that supports extension services for smallholder families through hand-held mobile devices used by a network of extension agents across the country to train farmers on various aspects of agronomy.
The consulting firm will provide the following services as part of this project;
1.Farmer profiling: The firm will profile 2,250 farmers targeted for this project.
2.Digitization of Content: IFC and Grainpulse are currently developing content on five crops being targeted for extension under this project[Barley, Sorghum, Maize, Beans and Coffee].
3.Extension: Using the content developed for the five crops, the firm will provide end to end extension services to smallholder farmers.
4.Tracking data on project KPIs: The project has defined specific indicators to track project performance.

Continue reading

eC2: PROVISION OF COMPREHENSIVE TRADE EFFLUENT WATER QUALITY ANALYSIS

Deadline:  15-Sep-2020 at 11:59:59 PM (Eastern Time – Washington D.C.) water

The scope of services under this RFP consists of the following:
Collect on-site composite samples from the industrial/commercial clients prioritized for sampling and analysis. Undertake effluent water quality analysis of collected samples covering all the typical pollutants limited and controlled by the utilities and guided by EMCA 1999 standards and regulations.
o The presence, concentrations and levels of contaminates to be analyzed should include but not limited to; toxic Metals (Chromium, Lead, Mercury, Zinc, Copper, etc.), Chemical Oxygen Demand (COD), Biochemical Oxygen Demand (BOD), Organics (Hydrocarbons, Pesticides, Herbicides), Flammable Substances. A tentative list is provided in Annex I. The final list will be concluded during the Inception stage.
o The following sectors have been preliminarily identified as high-risk and would be useful for consideration for sample effluent water analysis;

Continue reading

eC2:  Capacity building on non-revenue water reduction and control, including through performance-based contracts, for the water and sewerage

Deadline: 10-Sep-2020 at 11:59:59 PM (Eastern Time – Washington D.C.)img_2137

The activity consists in capacity building on non-revenue water (NRW) reduction and control, including through performance-based contracts (PBCs), of the water and sewerage utility of the State of Pernambuco, Brazil (Compesa), and is part of the “Recife Smart Urban Water Management” Program, aiming to support the modernization of water supply and sanitation service delivery in the Recife Metropolitan Region (RMR), through the piloting of innovative smart water approaches. The specific objective of this activity is to develop and deliver a training program on NRW reduction and PBCs, comprising four modules, as well as both a distance learning and an in person components. In addition, the Firm will deliver a NRW reduction and PBC toolkit as a reference and guide for Compesa.

Continue reading

eC2: Water Innovation Platform

Deadline: 10-Sep-2020 at 11:59:59 PM (Eastern Time – Washington D.C.) water

The World Bank (WB) will facilitate one-day virtual events to showcase technologies available on the market to client organizations local governments, utilities, and other service providers in each of two (2) selected regions, which will be identified based on initial client and WB Water Global Practice regional unit demand.
See Full tender link below to see the TOR

Continue reading

eC2: Support for articulating the Blue Economy and coastal adaptation investment priorities for Seychelles climate resilience

Deadline: 07-Sep-2020 at 11:59:59 PM (Eastern Time – Washington D.C.)blue_recovery_world_bank_environment

This consultancy is aimed at supporting the revision of the Seychelles NDC with a specific focus on Blue Economy. The consultant will be expected to 1) draft sections of the NDC to incorporate the various aspects of Blue Economy in the adaption and mitigation section and for various sectors, and 2) contribute to draft the National Adaptation plan outlining clear priorities for investment from the Blue Economy and coastal adaptation perspective, essential to achieve climate resilience in the Seychelles.

Continue reading

eC2: Baseline Assessment for Plastic Debris flowing into Rivers and Seas of South Asia

Deadline: 01-Sep-2020 at 11:59:59 PM (Eastern Time – Washington D.C.)

westafrica_coastalerosion_780x520

The primary objective of this Consultancy is to take stock of baseline information for plastic waste leakage into rivers and seas to build a more harmonized regional monitoring, management, and policy framework for plastic waste reduction and enable a more circular economy model for plastics in the South Asia Region. The proposed assignment will document the current status of plastic pollution and its value chain (e.g. hotspots for marine plastic debris, waste composition, material flow of waste plastics), regulatory gap analysis, and identification of relevant stakeholders involved in the life-cycle of plastic and their needs, and possible recycling technology and innovations, etc.

Continue reading

eC2: Preparation of Flood Hazard and Flood Risk Maps (FHRM) and Flood Risk Management Plans (FRMP)

Deadline: 31-Aug-2020 at 11:59:59 PM (Eastern Time – Washington D.C.)floods

The assignment aims to develop flood hazard and flood risk maps (FHRM) and flood risk management plans (FRMP) for all twelve Units of Management of Romania, i.e. for 11 river basins and for the Danube River, in line with the EU Floods Directive. Furthermore, the assignment also aims to develop a plan for measures that are to be taken nationally.

Continue reading

eC2: Guyana- Improving Urban Resilience of Coastal Cities in the Caribbean through Resilient Infrastructure and Urban Planning

Deadline: 31-Aug-2020 at 11:59:59 PM (Eastern Time – Washington D.C.) blog-in-benin-can-resilient-investment-solutions-save-a-battered-coast-780x439

The consultancy primary objective is to provide professional expertise to develop a comprehensive urban resilience plan for the select coastal cities in Guyana, which aims to,
1.Study approaches for improving urban infrastructure planning to achieve resilience goals in coastal cities for the sustainable concurrence of the urban space with natural environment;
2.Help urban practitioners better understand the integration of green with existing grey infrastructure and contextually inform citiesplanning strategies; and
3.Forge an urban vision to identify infrastructure need and investment opportunities for the cities in the selected coastal areas.
Scope of Work
As part of the EU-GFDRR/WB Regional Resilience Program for LAC, the project will focus on carrying out diagnostic work related to urban resilience in selected coastal cities in Guyana. The main objective is to develop an integrated vision for building resilience and sustainability into infrastructure.

Continue reading

eC2: Grenada – Improving Urban Resilience of Coastal Cities in the Caribbean through Resilient Infrastructure and Urban Planning

Deadline: 31-Aug-2020 at 11:59:59 PM (Eastern Time – Washington D.C.) water-pollution-cartoon

The consultancy objective is to provide professional expertise to develop a comprehensive urban resilience plan for the select coastal cities in Grenada which aims to,
1.Study approaches for improving urban infrastructure planning to achieve resilience goals in coastal cities for the sustainable concurrence of the urban space with natural environment;
2.Help urban practitioners better understand the integration of green with existing grey infrastructure and contextually inform cities planning strategies; and
3.Forge an urban vision to identify infrastructure need and investment opportunities for the cities in the selected coastal areas.
Scope of Work
As part of the EU-GFDRR/WB Regional Resilience Program for LAC, the project will focus on carrying out diagnostic work related to urban resilience in selected coastal cities for Grenada. The main objective is to develop an integrated vision for building resilience and sustainability into infrastructure.

Continue reading

eC2: Malishi – Ag Tech

Deadline:  27-Aug-2020 at 11:59:59 PM (Eastern Time – Washington D.C.)

The West Africa Agricultural Productivity Program (WAAPP) - Ghan

Mali Shi is a new entrant in the global shea sector in Mali. Its founders opened the Bamako-headquartered company after gaining many years of experience in the industrial manufacturing sector, where they are leading experts in the manufacture and distribution of batteries. IFC Mali Shi Advisory Project is designed to enhance Mali Shis operational efficiencies through the introduction of digital tools (Ag Tech), thereby improving smallholder farmers (SHFs) productivity and income. By the end of the project, we expect 10,000 SHFs to be engaged with AgTech solutions. Malishi, with IFC support, is seeking for a Consulting firm to help introduce IT based system to help Malishi to procure shea nuts and strengthen its relationships with local farmers, assist farmers in managing their farm, provide traceability, improve efficiency in onsite data collection including crop forecasting, and strengthen sustainability of the project.

Continue reading