Deadline: 16-Feb-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)
The objective of this assignment is to prepare a feasibility level design for the proposed (approximately) 60km section of the Naoro-Brown Hydropower Access Road with a Class 4 Bill of Quantities (BoQ) cost estimate.
You must be logged in to post a comment.