Deadline: 09-Mar-2020 at 11:59:59 PM (Eastern Time β Washington D.C.)
Existing railway track from Karachi to Hyderabad is an important corridor for freight and passenger movement between Karachi and inland Provinces. The freight exchange has vital significance for the economic development of Pakistan. Existing railway alignment between Karachi to Hyderabad is facing problem of congestion, over stressed track structure and outdated signaling and telecommunication system. Upgrading or constructing a new double line link is therefore required to resolve these issues.
The objectives of the study is to conduct and technical and commercial feasibility study for Karachi-Hyderabad ( passenger and freight line) and Karachi-Pipri (dedicated freight corridor).
See full tender here: Feasibility and PPP option study of upgrading the rail line between Karachi and Hyderabad , including constructing a dedicated freight corridor between Karachi and Pipri.
eConsultant2 website: https://wbgeconsult2.worldbank.org/wbgec/index.html
Tender notification: # 1267014
Assignment Countries:
- PK – Pakistan
You must be logged in to post a comment.