eC2:Guinea-Bissau : Feasibility study for the development of utility-scale solar PV with storage

Deadline:  10-Apr-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)  scaling+solar+main+banner

Objective:  The objective of this assignment is to carry out a feasibility study for the development of up to three utility-scale solar PV plants with battery storage, combined or separate, with a total installed capacity of 20-30 MWp to provide additional lower-cost generation and improve grid stability. The feasibility study is the centerpiece of Phase I of a potential two-phased assignment composed of: Phase I – Feasibility study, and Phase II Project design and tendering. The consultant will provide the optimal portfolio of solar PV plants taking into account technical, solar resource, environmental and land constraints. The assessment will focus on the technical, commercial and institutional aspects required to develop a sustainable project, including potential sites around Bissau-city, interior and southern regions.

See full tender here: Guinea-Bissau Feasibility study for the development of utility-scale solar PV with storage 

EConsultant2 website: https://wbgeconsult2.worldbank.org/wbgec/index.html

Tender notification:  # 1256360

Assignment Countries:

  • GW – Guinea-Bissau

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s