Deadline: 23-Mar-2017 at 11:59:59 PM (Eastern Time – Washington D.C.)
The work under this project will be done through the three major tasks described below:
1. Feasibility study of energy storage for frequency support in WAPP power system
2. Assessment of energy storage applications in WAPP countries (on grid systems and off-grid mini grids, building/factory storage, etc.)
3. Financial assessment of incorporating energy storage for grid support
See full tender here: assessment-of-battery-energy-storage-applications-in-the-west-african-power-pool-wapp-utilities-and-countries
eConsultant2 website: https://wbgeconsult2.worldbank.org
Tender notification: # 1237432
Assignment Countries:
- BJ – Benin
- CI – Cote d’Ivoire
- BF – Burkina Faso
- GH – Ghana
- GM – Gambia, The
- GN – Guinea
- GW – Guinea-Bissau
- LR – Liberia
- ML – Mali
- NE – Niger
- NG – Nigeria
- SN – Senegal
- SL – Sierra Leone
- TG – Togo
- CV – Cape Verde
You must be logged in to post a comment.