eC2: Assessment of Battery Energy Storage Applications in the West African Power Pool Utilities and Countries

Deadline: 23-Mar-2017 at 11:59:59 PM (Eastern Time – Washington D.C.)

The work under this project will be done through the three major tasks described below:solar-energy
1. Feasibility study of energy storage for frequency support in WAPP power system

2. Assessment of energy storage applications in WAPP countries (on grid systems and off-grid mini grids, building/factory storage, etc.)

3. Financial assessment of incorporating energy storage for grid support


See full tender here: assessment-of-battery-energy-storage-applications-in-the-west-african-power-pool-wapp-utilities-and-countries

eConsultant2 website: https://wbgeconsult2.worldbank.org

Tender notification: # 1237432

Assignment Countries:

  • BJ – Benin
  • CI – Cote d’Ivoire
  • BF – Burkina Faso
  • GH – Ghana
  • GM – Gambia, The
  • GN – Guinea
  • GW – Guinea-Bissau
  • LR – Liberia
  • ML – Mali
  • NE – Niger
  • NG – Nigeria
  • SN – Senegal
  • SL – Sierra Leone
  • TG – Togo
  • CV – Cape Verde