eC2:Case Studies and Technical Guides for Resilient Infrastructure PPPs

Deadline: 07-Sep-2016 at 11:59:59 PM (Eastern Time – Washington D.C.)PPPs

The Project consists of two components: Knowledge Development and Knowledge Exchange & Dissemination. The first component will study the evolution of disaster resilient PPP projects and the contractual and procurement structure that has impacted on private investment. The second component will consist of workshops where lessons learned will be discussed and shared among stakeholders. The final Technical Guides will be produced combining the case studies and the outcome of the workshops, disseminated through several channels to feed into PPP project preparation and standardization of PPP documents.

See full tender here: Case Studies and Technical Guides for Resilient Infrastructure PPPs

eConsultant2 website: https://wbgeconsult2.worldbank.org

Tender notification: # 1227254

Assignment Countries:

JP – Japan