eConsultant2: Support India’s Ministry of New and Renewable Energy to Draw up Rollout Plan for Renewable Energy.

Deadline:  24-Sep-2015 at 11:59:59 PM (Eastern Time – Washington D.C.)

File:India fields and wind turbines.jpgThe World Bank now intends to engage a Consulting Firm to study the finalized 24X7 plans with respect to Renewable energy and prepare a state wise roll out plan for the implementation of the plans. The consultants will also be required to support MNRE in coordination with the states for the renewable energy aspect of the 24X7 plan
The Govt. of India (GoI) has set an ambitious goal of providing uninterrupted power for all homes, industrial and commercial establishments and adequate power for farms by 2022. Towards this objective, GoI has decided to take a joint initiative with all states to provide 24×7 power to all consumers except agriculture consumers. This initiative aims at ensuring uninterrupted supply of quality power to existing consumers by the end of 12th five year plan i.e. 2017 and providing access to electricity to all unconnected consumers in the next five years by 2019. The plan touches upon renewable energy both grid connected and off- grid context.
See full tender here: #1199123 Support to MNRE to draw up the state wise roll out plan for the renewable energy component of 24X7 Power for all plans

eConsultant2 website: https://wbgeconsult2.worldbank.org

Tender notification: # 1199123

Assignment Countries:

  • IN – India

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s