eC2: Variable Renewable Energy Integration and Deployment

Deadline:  22-Feb-2018 at 11:59:59 PM (Eastern Time – Washington D.C.) Renewable-energy

Objective: The assignment has five objectives: (i) Analyze the technical and commercial constraints present in the dispatch system through discussions with NTDC and CPPA, and recommend specific improvements that could be implemented to increase the flexibility in the grid of the future generation and by adapting the current utilization of the installed generators; (ii) Analyze the actual and forecasted electricity demand and planned generation to provide technical inputs to the least-cost planning; (iii) Support and train the planning team (NTDC) in running a thorough least-cost planning tool that can integrate the variability of solar, wind and hydro as well as price ancillary services; (iv) Identify and propose specific changes to the energy market to increase flexibility in the system and price ancillary services looking at Energy Purchase Agreements (EPA), grid code requirements and ancillary service market; and (v) Build the capacity of the Client agencies to continue and further build on the analysis following the completion of this assignment.

See full tender here: Variable Renewable Energy Integration and Deployment

EConsultant2 website: https://wbgeconsult2.worldbank.org/wbgec/index.html

Tender notification:  # 1255232

Assignment Countries:

  • PK – Pakistan

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s