eC2: Integrated Water and Hydropower Development in the Drina River Basin

Deadline: 07-Feb-2019 at 11:59:59 PM (Eastern Time – Washington D.C.)images.jpg

Historically, two approaches have been used to assess the options for utilization of the HPP potential in the DRB:

1. Development of the basin-wide studies, followed by
2. Development of the technical design documents and environmental and social impact assessments for identified priority projects.

At this stage, in order to evaluate the options for construction of greenfield and rehabilitation of existing hydropower plants in the wider DRB, the WBG intends to conduct a detailed review of existing river basin studies as well as technical and environmental and social studies, reports and assessments developed for candidate HPP projects.

See full tender here: integrated water and hydropower development in the drina river basin

eConsultant2 website: https://wbgeconsult2.worldbank.org/wbgec/index.html

Tender notification: # 1260931

Assignment Countries:

  • BA – Bosnia and Herzegovina
  • ME – Montenegro
  • YF – Serbia