Deadline: 21-Mar-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)
Objective: The objective of this assignment is to prepare a geospatial analysis and present the least cost options for electrification for villages located within the radio of 100 km of the substations of the OMVG in The Gambia and Guinea Bissau, and the Substations of the OMVS in Mali. The analysis will provide detailed estimation of investment and operating cost requirements.
See full tender here: GIS- Based electrification Study for the ECOWAS Regional Access Project
EConsultant2 website: https://wbgeconsult2.worldbank.org/wbgec/index.html
Tender notification: # 1256168
Assignment Countries:
- GM – Gambia, The
- GW – Guinea-Bissau
- ML – Mali
You must be logged in to post a comment.