eC2: GIS- Based electrification Study for the ECOWAS Regional Access Project

U.S. Electricity Output Rose 6.2% From A Year EarlierDeadline:  21-Mar-2018 at 11:59:59 PM (Eastern Time – Washington D.C.)

Objective:  The objective of this assignment is to prepare a geospatial analysis and present the least cost options for electrification for villages located within the radio of 100 km of the substations of the OMVG in The Gambia and Guinea Bissau, and the Substations of the OMVS in Mali. The analysis will provide detailed estimation of investment and operating cost requirements.

See full tender here: GIS- Based electrification Study for the ECOWAS Regional Access Project

EConsultant2 website: https://wbgeconsult2.worldbank.org/wbgec/index.html

Tender notification:  # 1256168

Assignment Countries:

  • GM – Gambia, The
  • GW – Guinea-Bissau
  • ML – Mali

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s