eC2: Madagascar: Off-Grid Solar Market Assessment and Design Options

Deadline: 12-Jul-2017 at 11:59:59 PM (Eastern Time – Washington D.C.) scaling+solar+main+banner

(i) Projecting likely grid access rates over the medium-term (by leveraging information on current and expected electric grid coverage), and subsequently mapping out areas that will need to be served by off-grid solutions; (ii) Estimating the size of the potential commercial off-grid market through countrywide household and SME surveying focused on ability and willingness to pay for electricity service and/or off-grid solar products; (iii) Stocktaking on institutional electricity access, including the number, variety, and location of institutions that are off the grid and their likely electricity needs going forward; and (iv) Identification of barriers/risks across the local off-grid solar value chain, and a review of the regulatory structure as it pertains to the products and range of distribution models.


See full tender here: Madagascar- Off-Grid Solar Market Assessment and Design Options

eConsultant2 website: https://wbgeconsult2.worldbank.org

Tender notification: #1246019

Assignment Countries:

  • MG – Madagascar