eC2: Battery storage Installation in Senegal. Preparation of tender documents and implementation support

Deadline: 20-Mar-2019 at 11:59:59 PM (Eastern Time – Washington D.C.) index

With the objective of facilitating the development and integration of renewable energies in Senegal, this study aims to prepare the tender documents to put in place battery storage (60MW capacity 30mn 1h for frequency regulation) and their integration in the electricity network for their installation and operation in the short term. The Consultant should prepare the tender documents for the installation, integration of these batteries and their operationalization during one year. Based on the existing studies, the Consultant should confirm the size and location of the battery storage.

See full tender here: Battery storage Installation in Senegal. Preparation of tender documents and implementation support

eConsultant2 website: https://wbgeconsult2.worldbank.org/wbgec/index.html

Tender notification: # 1261620

Assignment Countries:

  • SN – Senegal

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s